- Source: A6 motorway (Romania)
The A6 motorway (Romanian: Autostrada A6) is a partially built motorway in Romania, planned to connect Bucharest with the Banat region, through the southern part of the country. It will follow the route: Craiova, Calafat, Drobeta-Turnu Severin, Lugoj, connecting with the A1 motorway near Balinț. The section between Balinț and Calafat, where it will provide access to the New Europe Bridge, is part of the southern branch of the Pan-European Corridor IV.
Description
It is currently operational on a section of 11.4 km, between the interchange with the A1 motorway near Balinț and Lugoj. The segment was part of the construction contract for the first section of the A1 motorway sector between Lugoj and Deva, and is operational since December 2013.
The rest of the project has been in pre-feasibility phase since October 2012, as the South Motorway (Romanian: Autostrada Sudului), and the precise route is yet to be decided. A junction with the future Pitești–Craiova Expressway is planned near the city of Craiova.
The Lugoj-Calafat segment has received attention in 2020 for being built as a NATO strategic project.
Exit list
The entire route is in Timiș County.
References
Kata Kunci Pencarian:
- A6 motorway (Romania)
- List of A6 roads
- Highways in Romania
- A1 motorway (Romania)
- List of highways numbered 6
- Transport in Romania
- Highways in Bulgaria
- DEx12 expressway
- Via Carpathia
- Motorways in Serbia