- Source: Maxim Power
Based in Calgary, Maxim Power Corp. (TSX: MXG) is one of Canada's largest truly independent power producers, focused entirely on power projects in Alberta. Its core asset - the 300 MW H. R. Milner Plant ("M2") in Grande Cache, AB is a state-of-the-art combined cycle gas-fired power plant that commissioned in Q4, 2023. MAXIM continues to explore additional development options in Alberta including its currently permitted gas-fired generation projects and the permitting of its wind power generation project. It was founded on July 9, 1993.
The company's wholly owned subsidiary, Summit Coal, has coal leases in the province of Alberta.
Generating facilities
Maxim Generating stations are either owner directly by Maxim Power or through subsidiaries.
= Canadian facilities
=References and footnotes
External links
Maxim Power Corporation
Kata Kunci Pencarian:
- The Lord of the Rings: The Rings of Power
- Daftar senjata infanteri pada Perang Dunia II
- Vladimir Putin
- Han So-hee
- Nisbah sinyal–derau
- Lana Del Rey
- Mohammad Reza Pahlavi
- Avril Lavigne
- Gal Gadot
- Dewan Koordinasi (Belarus)
- Maxim Power
- Maxim Baldry
- Hiram Maxim
- Maxim gun
- Maxim Integrated
- Maxim (musician)
- Maxim (magazine)
- Maxims of equity
- List of generating stations in Alberta
- Companies listed on the Toronto Stock Exchange (M)
The Gypsy Camp Vanishes Into the Blue (1976)
No More Posts Available.
No more pages to load.