    • Source: Meru Wind Power Station
    • Meru Wind Power Station, also Meru Wind Farm, is a 400MW wind-powered power station, under construction in Kenya.


      Location


      The power station is located in northwestern Meru County, near the Meru County–Isiolo County border, south of Isiolo Airport. This location lies approximately 274 kilometres (170 mi), by road, northeast of Nairobi, the capital and largest city in Kenya. The approximate coordinates of the power station are 0°19'47.0"N, 37°35'30.0"E (Latitude:0°19'47.0"N; Longitude:37°35'30.0"E).


      Overview


      As part of efforts to diversify the national electricity sources, the government of Kenya plans to construct a 400 megawatt wind power station in Meru County. Kenya Electricity Generating Company, the government-controlled power generator will own and operate the power station. The first phase of this power station with generation capacity of 100MW was expected to come online in 2017, but delayed due to land disputes. An 80 MW combined wind, solar and battery project began construction in 2020.


      Development partners


      The project's first phase with capacity of 100 megawatts will cost approximately US$270 million (KSh26.4 billion), borrowed from France’s Development Agency (AfD) and Germany’s Development Bank (KfW).


      See also



      List of power stations in Kenya
      Wind power in Kenya


      References




      External links


      KenGen
      Ministry of Energy and Petroleum (Kenya)
      Energy Regulation Commission (Kenya)
      Kenya Power
      Meru strikes Sh20b deal for wind power generation

    Kata Kunci Pencarian: