No More Posts Available.

No more pages to load.

    • Source: SM UB-127
    • SM UB-127 was a German Type UB III submarine or U-boat in the German Imperial Navy (German: Kaiserliche Marine) during World War I. She was commissioned into the German Imperial Navy on 1 June 1918 as SM UB-127.
      UB-127 was lost at the North Sea Mine Barrage in September 1918.


      Construction



      She was built by AG Weser of Bremen and following just under a year of construction, launched at Bremen on 27 April 1918. UB-127 was commissioned later the same year under the command of Oblt.z.S. Walter Scheffler. Like all Type UB III submarines, UB-127 carried 10 torpedoes and was armed with a 10.5 cm (4.13 in) deck gun. UB-127 would carry a crew of up to 3 officer and 31 men and had a cruising range of 7,280 nautical miles (13,480 km; 8,380 mi). UB-127 had a displacement of 512 t (504 long tons) while surfaced and 643 t (633 long tons) when submerged. Her engines enabled her to travel at 13.9 knots (25.7 km/h; 16.0 mph) when surfaced and 7.6 knots (14.1 km/h; 8.7 mph) when submerged.


      References




      = Notes

      =


      = Citations

      =


      Bibliography

    Kata Kunci Pencarian: