- 1
- 2
- Source: Amaranth Wind Farm
The Conjuring (2013)
Signs (2002)
Squealer (2023)
The Witch (2016)
Jack the Giant Slayer (2013)
A Million Miles Away (2023)
An Easter Bloom (2024)
Us (2019)
Penguins of Madagascar (2014)
Poor Things (2023)
Ratatouille (2007)
YellowBrickRoad (2010)
No More Posts Available.
No more pages to load.
The Amaranth Wind Farm, also known as the Melancthon EcoPower Centre, is a 199.5 megawatt (MW) wind farm in Amaranth and Melancthon Township, near Shelburne, Ontario. The centre is owned and operated by TransAlta and at the time of opening, was Canada's largest wind energy installation.
Construction of the Melancthon EcoPower Centre began with the 67.5 MW Phase I in 2005 and achieved commercial operation in March 2006. Construction of the 132 MW Phase II of the project began in 2007 and achieved full commercial operation in November 2008.
See also
List of wind farms in Canada
List of offshore wind farms
References
External links
"Where is my Electricity Coming From at this Hour? (if I lived in Ontario)" (Canadian Nuclear Society, with data from IESO)