- Source: Bargoed railway station
Bargoed railway station serves the town of Bargoed in the county borough of Caerphilly, South Wales. It is a stop on the Rhymney branch of the Valley Lines network. It is located close to the Bargoed Interchange bus station.
History
The station was opened on 31 March 1858 by the Rhymney Railway and was once a busy junction, serving lines to Newport (via Bedwas) and Brecon (the Brecon and Merthyr Tydfil Junction Railway) as well as the current route, but the latter pair were both closed to passengers on 31 December 1962 and completely in 1963–5. The junction site and trackbed of the old Brecon line is still visible north of the station.
In 1905 it was renamed Bargoed and Aber Bargoed reverting to its original name in 1924 There was another similarly name station, Aber Bargoed, opened by the Brecon & Merthyr Junction Railway & located on the now defunct Newport line north of Bargoed South Junction.
Services
The Monday to Saturday daytime service pattern is four trains an hour southbound to Cardiff Central: three continue to Barry Island and one to Bridgend. Northbound two trains an hour run to Rhymney, one skipping intermediate stations. The frequency decreases in the evening.
On Sundays, the service pattern is one train an hour southbound to Cardiff Central and Barry Island, and one an hour northbound to Rhymney.
Bus station
Bargoed Interchange, opened in 2011, is a three-minute walk from the railway station.
The redeveloped bus station building was funded through the European Union Regional Development Fund, and through the Welsh Government's Targeted Match Funding, Transport Grant programme, and the Heads of the Valleys Programme.
Bus services run to Newport, Merthyr Tydfil, Blackwood, Caerphilly, Pontypridd, and Ystrad Mynach
References
External links
Train times and station information for Bargoed railway station from National Rail