- Source: Big Bend Dam
Big Bend Dam is a major embankment rolled-earth dam on the Missouri River in Central South Dakota, United States, creating Lake Sharpe. The dam was constructed by the U.S. Army Corps of Engineers as part of the Pick-Sloan Plan for Missouri watershed development authorized by the Flood Control Act of 1944. Construction began in 1959 and the embankment was completed in July 1963. Power generation began at the facility in 1964 and the entire complex was completed in 1966 at a total cost of $107 million. The hydroelectric plant generates 493,300 kilowatts of electricity at maximum capacity, with an annual production of 969 million kilowatt hours, and meets peak-hour demand for power within the Missouri River Basin.
Located near Fort Thompson, South Dakota, just south of the Big Bend of the Missouri River, a large meander, Big Bend Dam creates Lake Sharpe, named after South Dakota Governor Merrill Q. Sharpe. The lake extends for 80 miles (130 km) up the course of the Missouri River passing through Pierre, the State Capitol, to Oahe Dam, another major power-generating and flood control dam. Lake Sharpe covers a total of 56,884 acres (23,020 ha) and drains an area just under 250,000 square miles (650,000 km2).
South Dakota Highway 47 crosses over the dam, connecting Lyman and Buffalo Counties. Big Bend Dam is located approximately 17 miles (27 km) north of I-90, and approximately 60 miles (97 km) southeast of Pierre.
The next dam upstream is Oahe Dam, near Pierre, and the next dam downstream is Fort Randall Dam, near Pickstown.
Native American tribes
The construction of the dam resulted in the dislocation of people on the Crow Creek and Lower Brule Reservations. The flooding of the land for the reservoir also resulted in the loss of limited plant life resources used by them for food and medicine.
A monument at Big Bend Dam dedicated in 2002, the Spirit of the Circle Monument, honors the more than 1,300 people who died over a three-year period in the 1860s at the Crow Creek Reservation near the present site of the dam.
2011 Missouri River flood
For the first time in the dam's history, the US Army Corps of Engineers opened the dam's spillway gates on the morning of June 3, 2011. In response to the 2011 Missouri River Floods, the dam was releasing 150,000 cubic feet per second (4,200 m3/s), which greatly exceeded its previous record release of 74,000 cu ft/s (2,100 m3/s) set in 1997.
See also
Lake Sharpe
Pick-Sloan Plan
U.S. Army Corps of Engineers
Crow Creek Indian Reservation
Lower Brule Indian Reservation
References
Janson, Donald (May 30, 1960). "6th Missouri River Dam Begun; Last in Flood-Control Network; Big Bend Project Scheduled for Completion in 1963 – Johnson Urges Others. 6th Dam Started on Missouri River". The New York Times. Retrieved 2008-09-27.
External links
U.S. Army Corps of Engineers - Big Bend Dam
Daily Reservoir Levels and Water Releases - U.S. Army Corps of Engineers Archived 2018-04-15 at the Wayback Machine.
Kata Kunci Pencarian:
- Skenario Asli Terbaik (Writers Guild of America Award)
- Daftar kota di Minnesota
- Daftar julukan kota di Amerika Serikat
- Cakupan Google Street View
- Taman Perdamaian Internasional Waterton-Glacier
- Sungai Rio Grande
- Daftar tempat di Alabama/A-L
- Daftar wilayah dalam Sistem Taman Nasional Amerika Serikat
- Daftar county dan daerah setingkat county di Amerika Serikat
- Daftar bandar udara di Ontario
- Big Bend Dam
- Big Bend
- Oahe Dam
- Lake Sharpe
- Pick–Sloan Missouri Basin Program
- Big Bend, California
- Sharpe
- Fort Peck Dam
- Crow Creek Indian Reservation
- Big Bend (Missouri River)