- Source: Buffalo Gap Wind Farm
The Buffalo Gap Wind Farm is located in Nolan and Taylor Counties, about 20 miles (30 km) south west of Abilene, Texas. It was constructed in three phases and has a total wind generation capacity of 523.3 megawatts (MW).
Facility details
Buffalo Gap 1 consists of 67 Vestas V-80 wind turbines, each rated at 1.8 MW, for a total capacity of 120.6 MW. The wind farm was developed by SeaWest WindPower and is currently owned by AES Wind Generation. The power is sold to Direct Energy Texas under a 15-year power purchase agreement.
Buffalo Gap 2 is a 232.5 MW expansion consisting of 155 GE SLE 1.5 MW wind turbines. The facility was developed by AES Wind Generation and went into commercial operation in June 2007. The power is sold to Direct Energy under a 10-year power purchase agreement.
Buffalo Gap 3 is a 170.2 MW addition, completed in September 2008, consisting of 74 Siemens 2.3 MW wind turbines.
Electricity production
See also
Wind power
List of onshore wind farms
References
Kata Kunci Pencarian:
- Daftar wilayah dalam Sistem Taman Nasional Amerika Serikat
- Buffalo Gap Wind Farm
- Buffalo Gap
- Wind farm
- Wind power in Texas
- List of onshore wind farms
- List of wind farms in the United States
- Texas Interconnection
- Wind power in the United States
- List of power stations in Texas
- Renewable energy in the United States