- Source: Crystal River Energy Complex
The Crystal River Energy Complex consists of seven power-generating plants on a 4,700-acre (1,900 ha) site near the mouth of the Crystal River in Citrus County, Florida. Crystal River 1, 2, 4, and 5 are fossil fuel power plants. Crystal River 3 was previously the sole nuclear power plant on the site (1977-2013). The Crystal River Combined Cycle site consists of two Mitsubishi gas turbines, which came on-line in 2018. The complex was developed in the early 1960s by the Florida Power Corporation and sold to Progress Energy Inc in 2000. Following Progress Energy's merger with Duke Energy in 2012, the facility is owned and operated by Duke Energy.
In February 2013, Duke Energy announced that Crystal River 3 would be permanently shut down.
Power plants
See also
Levy County Nuclear Power Plant
Progress Energy Inc
List of power stations in Florida
References
External links
The Crystal River Energy Complex Archived March 10, 2007, at the Wayback Machine
100 Largest Electric Plants
St. Petersburg Times: Second nuclear plant won't come without risks
Data on generation and fuel consumption from the Energy Information Administration Electricity Data Browser
Kata Kunci Pencarian:
- Metaloid
- Emas
- Daftar klub sepak bola divisi tertinggi di negara anggota AFC
- Crystal River Energy Complex
- Crystal River
- Crystal River Nuclear Plant
- Crystal River (Florida)
- List of power stations in Florida
- Florida Northern Railroad (current)
- Duke Energy
- Silver Springs, Ocala and Gulf Railroad
- Marion County, Florida
- Citrus County, Florida