- Source: Diamond Quadrilateral
The Diamond Quadrilateral is a project of the Indian Railways to establish a high-speed rail network in India.
The Diamond Quadrilateral will connect the four mega cities of India, viz. Delhi, Mumbai, Kolkata and Chennai, similar to the Golden Quadrilateral highway system.
High-speed train on Mumbai-Ahmedabad section will be the first high-speed train corridor to be implemented in the country. On 9 June 2014, the President of India, Shri Pranab Mukherjee, officially declared that the Government led by Prime Minister Narendra Modi will launch a Diamond Quadrilateral project of high-speed trains.
History
Prior to the 2014 general election, the two major national parties (Bharatiya Janata Party and Indian National Congress) pledged to introduce high-speed rail. The INC pledged to connect all of India's million-plus cities by high-speed rail, whereas BJP, which won the election, promised to build the "Diamond Quadrilateral" project, which would connect the cities of Chennai, Delhi, Kolkata, and Mumbai via high-speed rail. This project was approved as a priority for the new government in the incoming president's speech. Construction of one kilometer of high speed railway track will cost ₹100 crore (US$12 million) – ₹140 crore (US$17 million) which is 10-14 times higher than the cost of construction of standard railway.
India's Union Council of Ministers passed the proposal of Japan to build India's first high-speed railway on 10 December 2015. The planned rail will run approximately 500 km (310 mi) between Mumbai and the western city of Ahmedabad at a top speed of 320 km/h (200 mph). Under this proposal, the construction began in 2017 and is expected to be completed in the year 2022. The estimated cost of this project is ₹980 billion (US$12 billion) and is financed by a low-interest loan from Japan.
Operation is officially targeted to begin in 2023, but India has announced intentions to attempt to bring the line into operation one year earlier. It will transport the passengers from Ahmedabad to Mumbai in just 3 hours and its ticket fare will be cheaper than air planes, that is, ₹2,500-₹3,000.
Current status
As of July 2020, NHSRCL has floated almost 60% of tenders for civil works, and almost 60% of land is acquired for the first Mumbai-Ahmedabad corridor and the deadline of the project is December 2023.
The National High Speed Rail Corporation Limited, the implementing body of the project, has planned 7 routes which are Delhi to Varanasi via Noida, Agra and Lucknow; Varanasi to Howrah via Patna; Delhi to Ahmadabad via Jaipur and Udaipur; Delhi to Amritsar via Chandigarh, Ludhiana and Jalandhar; Mumbai to Nagpur via Nasik; Mumbai to Hyderabad via Pune and Chennai to Mysore via Bangalore.
According to reports, the NHAI will soon acquire land to lay tracks for high-speed trains along greenfield expressways for integrated development of the rail transport network in the country. to expedite the project, the Indian Railways along with the National Highways Authority of India (NHAI) will begin the process of acquiring additional land.
The decision to acquire additional land was taken during a recent meeting of a group of infrastructure ministers led by Union Minister Nitin Gadkari. During the infra sector group meeting, it was decided that the NHAI will take over land acquisition and a 4-member committee was constituted to take this process forward.
The four-member task force will work out the modalities for acquiring land and sharing the cost. It may be noted that the Indian Railways is in the process of preparing the blueprint of 7 high-speed rail routes in the country.
As per reports, The railway board has also written to the NHAI and given details of seven high-speed rail corridors for running bullet trains for which the detailed project reports are being prepared.
NHAI has been asked to depute a nodal officer for this purpose for better integration of the mammoth planning exercise. Railways plans to run bullet trains on 7 important new routes of the country.
See also
Similar rail development
Future of rail transport in India, rail development
High-speed rail in India
Similar roads development
Bharatmala
Golden Quadrilateral, completed national road development connectivity older scheme
National Highways Development Project, Subsumed in Bharatmala
North-South and East-West Corridor, Subsumed in Bharatmala
India-China Border Roads, Subsumed in Bharatmala
Expressways of India
Setu Bharatam, river road bridge development in India
Similar ports and river transport development
Indian Rivers Inter-link
List of National Waterways in India
Sagar Mala project, national water port development connectivity scheme
Similar air transport development
Indian Human Spaceflight Programme
UDAN, national airport development connectivity scheme
Highways in India
List of National Highways in India by highway number
List of National Highways in India
General
Transport in India
References
External links
High Speed Rail Corporation of India Limited
Powering a high-speed dream - Sanjib Kumar Das, Gulf News
New Indian government moots high-speed rail network, Chris Sleight, KHL Archived 14 July 2014 at the Wayback Machine
Kata Kunci Pencarian:
- Diamond Quadrilateral
- Rhombus
- List of high-speed railway lines in India
- New Delhi–Chennai main line
- Golden Quadrilateral
- High-speed rail in India
- High Speed Rail Corporation of India Limited
- Express trains in India
- National High Speed Rail Corporation Limited
- North–South and East–West Corridor