• Source: Jambur Solar Power Station
  • The Jambur Solar Power Station (JSPS), is an operational 23 MW (31,000 hp) solar power plant in Gambia. The power station began commercial operations in March 2024. It is owned and was developed by the government of Gambia, with funding from the European Union, the European Investment Bank and the World Bank. The power generated here is integrated into the Gambian national electricity grid, through the National Water and Electricity Company network.


    Location


    The power station is located in the community called "Jambur", in Kombo North District, in the Brikama Local Government Area, southwest of Banjul, the capital city of the country and south of the Gambia River. Jambur Solar Power Station sits on approximately 31.1 hectares (77 acres) of land, about 37.5 kilometres (23 mi), southwest of the city of Banjul.


    Overview


    Jambur Solar Power Station, is a component of the "Gambia Electricity Restoration and Modernization Project" (GERMP), a US$165 million infrastructure project financed by the European Investment Bank (EIB), the European Union (EU) and the World Bank (WB). The GERMP comprises the erection of the 23 MW JSPS, the construction and connection of an 8MWh battery energy storage system (BESS), the improvement of transmission and distribution electricity network in the country and the improvement of electricity connections to schools and health facilities. The project is expected to create 1,250 direct jobs during the construction, operation and maintenance phases.


    Developers


    The power station was developed by the Gambian Ministry of Petroleum and Energy and The National Water and Electricity Company (NAWEC), with funding from the EIB, EU and the WB.


    Construction costs, funding, and commissioning


    The engineering, procurement and construction (EPC) contract was awarded to Tebian Electric Apparatus (TBEA), a Chinese engineering and construction company. TBEA was also awarded a three-year operations and maintenance (O&M) contract. The table below illustrates the sources of funding for the (GERMP) infrastructure project.

    Note: Totals may be slightly off due to rounding.
    Construction began in February 2023. Commercial commissioning was achieved in March 2024.


    See also



    Soma Solar Power Station


    References




    External links


    Gambia Inaugurates 23 MWp Solar PV Plant To Revolutionize Energy Sector
    A Landmark Solar PV Plant Has Been Inaugurated In The Gambia

Kata Kunci Pencarian: