- Source: Kolkata Light Rail Transit
Kolkata Light Rail Transit (KLRT) is a mass rapid transit system proposed for the city of Kolkata in India. The Government of West Bengal and SREI Infrastructure Finance signed a memorandum of understanding (MoU) to set up the light rail transit (LRT) system. A special purpose vehicle, Kolkata Mass Rapid Transit Pvt Ltd has been formed to execute this Rs.6000 crore project.
History
April 2002: The Master Plan for Kolkata Metropolitan Area (KMA) for 2025 was submitted for the approval by the Metropolitan Planning Committee. It was proposed to be executed soon after securing agreement from the Chief Minister of West Bengal, Buddhadeb Bhattacharjee. It was suggested in the feasibility report that it will work well as an intermediate system for some selected corridors. The search for funding started and it did not sound much in public.
2004: The Kolkata government wanted assistance from the central government which agreed to provide assistance for one major transit system project. Bhattacharjee chose LRTS over the East-West Metro corridor for the assistance and asked the state transport secretary to prepare a revised feasibility study.
April 2005: The feasibility study by CES termed it as EMRTS (Elevated Mass Rapid Transit System) and proposed three corridors, all terminating at Esplanade. The rolling stock they proposed was high speed trams.
February 2009: The LRTS project was listed under JNNURM. It was to be jointly executed by SREI and the Czech-based AMEX Corporation on a Build-Operate-Transfer (BOT) basis. It was also proposed to make the LRTS station at Barrackpore a terminal point connecting it with the main line station. Mr. Hemant Kanoria, Chairman and Managing Director of Srei Infrastructure Limited signed an MOU with the Government of West Bengal to execute this project along with their consortium partners.
February 2020: The Housing Infrastructure Development Corporation (Hidco) is engaging a consultant to prepare a project proposal for either a ropeway system or a personalized rapid transit or a light rail transit (LRT) system from New Town's Action Area III to the Biswa Bangla Gate on the Narkeldanga intersection of the main arterial road in Action Area I.
Corridors
Corridor 1: Joka — Esplanade.
Corridor 2: Esplanade — Barrackpore.
Corridor 3: New Town (Narkelbagan) — Hatisala.
References
Kata Kunci Pencarian:
- Light Rail Transit (Singapura)
- Sistem Angkutan Kereta Ringan Manila
- Manila Metro Rail Transit System
- Angkutan cepat
- Kereta api komuter
- Chennai Metro
- Sistem metro menurut jumlah penumpang tahunan
- Moda terpadu ramai
- Daftar jaringan metro
- Ahmedabad Metro
- Kolkata Light Rail Transit
- Kolkata Metro Line 6
- Urban rail transit in India
- Manila Light Rail Transit System
- Manila Metro Rail Transit System
- Light Rail (MTR)
- Kolkata Metro Line 5
- Light Rail Transit (Singapore)
- List of tram and light rail transit systems
- Changchun Rail Transit