- Source: Melbourne tram route 67
Melbourne tram route 67 is operated by Yarra Trams on the Melbourne tram network from Melbourne University to Carnegie. The 12.7-kilometre (7.9 mi) route is operated out of Glenhuntly depot with Z and B class trams.
History
Route 67 was first allocated to the line between Carnegie and the City (Swanston Street) on 1 November 1970, as part of a network-wide renumbering scheme. Prior to that, the line to Carnegie was serviced by route 4. When route numbers were first introduced to Melbourne's tram network, route 67 was allocated to the route between Point Ormond and Elsternwick. A number revision in 1938 led to route 67 being allocated between Balaclava Junction and St Kilda Beach via Dandenong Road and St Kilda Junction. Further changes on 1 August 1955 led to Route 67 becoming a shortworking for West Coburg services terminating in the City (William Street) rather than Domain Road. Trams traditionally terminated at the Victoria Street terminus, but following an accident in 1991, trams instead terminated at the Queensberry Street crossover. Due to congestion during peak hours at the crossover, some trams continued north to Melbourne University. Finally on 17 January 1996, a permanent shunt was built at Melbourne University. From then on, Route 67 trams were altered run full-time to Melbourne University.
The origins of route 67 lie in separate tram lines. The section of track between Queensberry Street (Stop 4) and Brunning Street (Stop 38) is the oldest section of this route, dating back to the Brighton Road cable tram which opened on 11 October 1888 by the Melbourne Tramway & Omnibus Company. This cable tram line was electrified in stages by the Melbourne & Metropolitan Tramways Board (MMTB). The section between Domain Interchange (Stop 20) and St Kilda Junction (Stop 30) was electrified on 27 December 1925. The section between Queensberry Street and City Road (near Stop 14) was electrified on the same day. The line between City Road and Domain Interchange was electrified on 24 January 1926. The Prahran & Malvern Tramways Trust opened the Glen Huntly Road line between Elsternwick (Stop 44) and Grange Road (Stop 62) on 13 November 1913. The MMTB extended this line to Carnegie on 19 December 1926. The section of track between Brunning Street and Glen Huntly Road (Stop 43) opened on 29 August 1926.
In December 1988 work began on duplicating the Truganini Road section of the line at Carnegie, the last single track section on the network. The work was completed in May 1989.
In January 2016, route 67 began operating through the night on Fridays and Saturdays as part of the Night Network.
Operation
Route 67 is operated out of Glenhuntly depot with Z and B class trams.
Route map
References
External links
Media related to Melbourne tram route 67 at Wikimedia Commons
Kata Kunci Pencarian:
- Daftar rute trem di Melbourne
- Lebar sepur ganda
- Daftar trem menurut lebar sepur dan elektrifikasi
- Melbourne tram route 67
- Melbourne tram route 72
- Melbourne tram route 109
- Melbourne tram route 6
- Melbourne tram route 16
- Melbourne tram route 57
- Melbourne tram route 75
- Melbourne tram route 59
- Melbourne tram route 5
- Melbourne tram route 96