- Source: Ohio State Route 752
State Route 752 (SR 752) is an east–west state highway in the south-central portion of Ohio. The western terminus of SR 752 is at a signalized T-intersection with US 23 on the north edge of South Bloomfield, and its eastern terminus is at SR 674 about 7 miles (11 km) east of Ashville on the Pickaway-Fairfield County Line.
SR 752 was created in the late 1930s. This two-lane state highway, which runs through the northeastern portion of Pickaway County, is becoming more highly traveled in recent years, as subdivisions are being constructed at a rapid rate in the Teays Valley Local School District.
Route description
The entirety of SR 752 is located in the northeastern quadrant of Pickaway County. No portion of the highway is included as a part of the National Highway System.
History
SR 752 was designated in 1937, following the alignment that it occupies to this day. No changes of major significance have taken place to this state route since its inception.