• Source: Oil megaprojects (2009)
  • This page summarizes projects that propose to bring more than 20,000 barrels per day (3,200 m3/d) of new liquid fuel capacity to market with the first production of fuel beginning in 2009. This is part of the Wikipedia summary of oil megaprojects.


    Quick links to other years




    Detailed project table for 2009



    Terminology

    Year startup: year of first oil, specific date if available
    Operator: company undertaking the project
    Area: onshore (LAND), offshore (OFF), offshore deep water (ODW), tar sands (TAR)
    Type: liquid category (i.e. natural gas liquids, natural gas condensate, crude oil)
    Grade: oil quality (light, medium, heavy, sour) or API gravity
    2P resvs: 2P (proven + probable) oil reserves in giga barrels (Gb)
    GOR: the ratio of produced gas to produced oil, commonly abbreviated GOR
    Peak year: year of the production plateau/peak
    Peak: maximum production expected (thousand barrels/day)
    Discovery: year of discovery
    Capital investment: expected capital cost; FID (Final Investment Decision). If no FID, then normally no project development contracts can be awarded. For many projects, a FEED stage (Front End Engineering Design) precedes the FID.
    Notes: comments and sources


    References

Kata Kunci Pencarian: