- Source: Ontario Highway 3
King's 3/info/highway" target="_blank">Highway 3, commonly referred to as 3/info/highway" target="_blank">Highway 3, is a provincially maintained 3/info/highway" target="_blank">highway in the Canadian province of 3/info/ontario" target="_blank">Ontario which travels parallel to the northern shoreline of Lake Erie. It has three segments, the first of which travels from the Ambassador Bridge in Windsor to 3/info/highway" target="_blank">Highway 77 in Leamington. The second portion begins at Talbotville Royal outside of St. Thomas at 3/info/highway" target="_blank">Highway 4, and travels to the western city limits of Port Colborne. The road is regionally maintained within Port Colborne as Niagara Regional Road 3, but regains its provincial designation at 3/info/highway" target="_blank">Highway 140. Its third and final terminus is at Edgewood Park, within the Fort Erie town limits. From there, the road continues as Niagara Regional Road 3 to the Peace Bridge, where drivers can cross to the United States. The total length of 3/info/highway" target="_blank">Highway 3 is 248.9 or 258.2 km (154.7 or 160.4 mi), consisting of 49.2 km (30.6 mi) from Windsor to Leamington, 187.9 km (116.8 mi) from Talbotville Royal to Port Colborne and 21.1 km (13.1 mi) from Port Colborne to Edgewood Park.
Until the late 1990s, 3/info/highway" target="_blank">Highway 3 formed a single continuous 413.2 km (256.8 mi) route from the Ambassador Bridge to near the Peace Bridge, but since then has had significant portion transferred to regional and county governments. A large segment of the route follows the historic Talbot Trail, a settlement road following the northern shore of Lake Erie constructed by Colonel Talbot in the early 1800s as part of a grand settlement plan along the lake front. East of Canborough, the road generally follows older settlement trails: Forks Road, connecting Dunnville with Wainfleet, portions of Sherk's Road, through Port Colborne to Gasline, and the Garrison Road, a military road built west from Fort Erie. The 3/info/highway" target="_blank">highway was initially designated in 1920, but not numbered until five years later. It originally connected to Niagara Falls, but was rerouted to Fort Erie following completion of the Peace Bridge in the late 1920s. Although a few portions of 3/info/highway" target="_blank">Highway 3 were upgraded in the years since, the 3/info/highway" target="_blank">highway generally follows the same route as it did in 1930. However, in 1997, segments through Port Colborne and Fort Erie were decommissioned as a provincial 3/info/highway" target="_blank">highway, followed by a segment of the route from Leamington to Talbotville Royal in 1998. All three now exist as county/regional roads. In Windsor, 3/info/highway" target="_blank">Highway 401 had terminated at a split interchange with 3/info/highway" target="_blank">Highway 3 where the freeway defaulted into Talbot Road, from 2011 to 2015 this segment of 3/info/highway" target="_blank">Highway 3 (Talbot Road and Huron Church Road) was realigned to accommodate the construction of the 3/info/highway" target="_blank">Highway 401 extension (also known as the Rt. Hon. Herb Gray Parkway, formerly Windsor-Essex Parkway).
Route description
3/info/highway" target="_blank">Highway 3 follows the route of the historic Talbot Trail for most of its length. Abutting the northern shore of Lake Erie between Windsor and Fort Erie, the route deviates in places to bypass towns and to avoid the less than direct trail laid nearly two centuries ago. Prior to 1998, the 3/info/highway" target="_blank">highway spanned this entire distance, but has since then been divided into three discontinuous sections. The western section travels 50.2 km (31.2 mi) from Windsor to Leamington. From there, a 145.0 km (90.1 mi) gap separates the western and central sections. 3/info/highway" target="_blank">Highway 3 resumes near St. Thomas at the southern end of 3/info/highway" target="_blank">Highway 4 and travels 187.9 km (116.8 mi) east to Port Colborne. The central and eastern sections are divided by a 3.4 km (2.1 mi) Connecting Link through Port Colborne. The eastern section begins at 3/info/highway" target="_blank">Highway 140 and travels 21.1 km (13.1 mi) to Fort Erie. It ends at Rosehill Road, a short distance west of the Peace Bridge crossing into New York.
= Western segment
=The western segment of 3/info/highway" target="_blank">Highway 3 begins at the Ambassador Bridge, which connects Canada with the U.S. state of Michigan over the Detroit River. The five lane 3/info/highway" target="_blank">highway travels southeast through Windsor along Huron Church Road, surrounded by residential subdivisions, then curves east along Talbot Road. The section through Windsor to Cabana Road is maintained under a Connecting Link agreement. Between the E. C. Row Expressway and Howard Ave, 3/info/highway" target="_blank">Highway 3 runs adjacent to the Rt. Hon. Herb Gray Parkway portion of 3/info/highway" target="_blank">Highway 401. At Essex County Road 11, 3/info/highway" target="_blank">Highway 3 enters rural southwestern 3/info/ontario" target="_blank">Ontario, and is dominated by farmland for much of its length through Essex County. The now four-laned route becomes divided as it follows the Essex Bypass around the southern edge of Essex, with commercial services lining the 3/info/highway" target="_blank">highway, primarily on the north side. Returning to farmland and narrowing to a two lane undivided road, the 3/info/highway" target="_blank">highway continues southeast, passing nearby, but avoiding, several small communities that the original 3/info/highway" target="_blank">highway travelled through. After passing Essex County Road 18, the route curves eastward, passing north of Kingsville before entering Leamington along its northern fringe. The western section ends at the southern terminus of 3/info/highway" target="_blank">Highway 77, where the provincially built but county maintained Leamington Bypass continues east to meet the Talbot Road just east of the town.
= Central segment
=The central segment is the longest of the three, at 187.9 km (116.8 mi). It begins at the southern terminus of 3/info/highway" target="_blank">Highway 4 at Talbotville Royal in Elgin County, just northwest of St. Thomas and south of London. The route travels east into St. Thomas, becoming a two-laned expressway aptly named the St. Thomas Expressway. This expressway begins at Wellington Road (Elgin County Road 25/26) and travels through St. Thomas to Centennial Road, featuring a single interchange. However, the right-of-way is wide enough to accommodate any future upgrade to a divided expressway. At the eastern end, 3/info/highway" target="_blank">Highway 3 turns south onto Centennial Road and then east onto Talbot Line, following the historic Talbot Trail to east of Aylmer. This mostly straight and rural portion passes through several small villages before the Talbot Trail splits from it to follow Elgin/Norfolk County Road 38 through Straffordville. 3/info/highway" target="_blank">Highway 3 meanwhile curves northeast and passes through Tillsonburg, encountering 3/info/highway" target="_blank">Highway 19. It then curves east and travels parallel to the St. Thomas and Eastern Railway to Courtland, remerging with the Talbot Trail and snaking towards Delhi, now within Norfolk County.
At Delhi, 3/info/highway" target="_blank">Highway 3 turns south for 4 km (2.5 mi) before returning to its eastward orientation. It continues through farmland to the town of Simcoe, where it meets 3/info/highway" target="_blank">Highway 24. From Simcoe to Canborough, the 3/info/highway" target="_blank">highway is nearly straight as an arrow, with an occasional jog to the northeast. It enters Haldimand County and intersects 3/info/highway" target="_blank">Highway 6 in Jarvis. At Cayuga it crosses the Grand River; until 2014, a five-span steel girder bridge crossed the river, but it has since been replaced by a concrete structure. At Canborough, the historic Talbot Trail ends and 3/info/highway" target="_blank">Highway 3 veers south to Dunnville, briefly travelling along the northern bank of the Grand River and gradually curving back eastward. East of Dunnville, the route follows Forks Road into Wainfleet and the Niagara Region. At Chambers Corners it turns south and passes through Wainfleet village, crossing the old Feeder Canal which once supplied the Welland Canal with water from the Grand River. Just north of Lake Erie, 3/info/highway" target="_blank">Highway 3 turns east and travels straight towards Port Colborne, passing just south of the Wainfleet Bog. At Townline Road, the boundary between Wainfleet and Port Colborne, the central section ends and the roadway continues as Niagara Regional Road 3 through the city, meeting the southern end of 3/info/highway" target="_blank">Highway 58.
Portions of the central segment of 3/info/highway" target="_blank">Highway 3 through several towns are maintained under Connecting Link agreements, including within Aylmer, Delhi, Simcoe, Cayuga and Dunnville. The combined length of these segments is 15.9 kilometres (9.9 mi).
= Eastern segment
=The final and shortest section of 3/info/highway" target="_blank">Highway 3 begins at 3/info/highway" target="_blank">Highway 140 on the eastern fringe of Port Colborne and lies entirely within Niagara Region. The 21.1 km (13.1 mi) segment travels several kilometres inland to Lake Erie, as well as parallel to it. From there it mostly travels along a straight line eastward through generally rural areas. The notable exception is the village of Gasline, where the Niagara Speedway stands on the northern side of the 3/info/highway" target="_blank">highway. At the Fort Erie boundary, the route widens to four lanes and jogs northeast to align with the old Garrison Road. As the 3/info/highway" target="_blank">highway progresses eastward into the town, the surroundings gradually become more urbanized before it ends at Rosehill Road. The roadway continues east through Fort Erie to the foot of the Peace Bridge as Niagara Regional Road 3, connecting with the Queen Elizabeth Way to provide access to the United States.
= Connections with the United States
=3/info/highway" target="_blank">Highway 3 was the only 3/info/ontario" target="_blank">Ontario provincial 3/info/highway" target="_blank">highway to both start and end at international crossings with the United States (the Ambassador Bridge leading into Detroit, Michigan and the Peace Bridge leading into Buffalo, New York, respectively). From Chicago, Toledo, and Detroit to Buffalo and Western New York, 3/info/highway" target="_blank">Highway 3 was shorter and more direct than any American route (including Interstate 90), because the Lake Erie shoreline dips south along Ohio, Pennsylvania, and New York. After the 1954 New York State Thruway opened from Buffalo to New York City, Michigan officials had encouraged 3/info/ontario" target="_blank">Ontario to replace 3/info/highway" target="_blank">Highway 3 with a toll road connecting Detroit to Buffalo.
When the Michigan Department of Transportation discontinued US 25 in 1973, much of it through Detroit was redesignated as M-3, whose southern terminus came at Clark Street in Detroit, at the junction of I-75 by the Ambassador Bridge. This provided a connection between Michigan's M-3 and 3/info/ontario" target="_blank">Ontario's 3/info/highway" target="_blank">Highway 3 until 2001, when jurisdictional changes within downtown Detroit created a discontinuous segment of M-3, and this international Route 3 connection was lost when the portion of M-3 along Fort Street was redesignated M-85.
3/info/highway" target="_blank">Highway 3 has been largely replaced as a Detroit–Buffalo truck route by portions of 3/info/highway" target="_blank">Highway 401, 3/info/highway" target="_blank">Highway 403 and the Queen Elizabeth Way. Although 3/info/highway" target="_blank">Highway 3 is a shorter distance between Detroit and Buffalo than the aforementioned 400-series highways, plus 3/info/highway" target="_blank">Highway 3 does not have to climb the Niagara Escarpment unlike parallel portions of 3/info/highway" target="_blank">Highway 403 (the Chedoke Expressway section) and the QEW, there has been traffic preference for these higher-speed 400-series highways which are also routed through major cities (London, Hamilton, St. Catharines) and which have in turn received more upgrades and extensions. During this time the only upgrades to 3/info/highway" target="_blank">Highway 3 were the Essex Bypass and St. Thomas Expressway, as the rest of the route remained a two-lane road passing through small communities. The last section of 3/info/highway" target="_blank">Highway 403 between Brantford and Ancaster opened in August 1997, making for a continuous express route between Windsor and Fort Erie, replacing 3/info/highway" target="_blank">Highway 2 which had been the previous link from 3/info/highway" target="_blank">Highway 401 to the Ancaster-Hamilton segment of 3/info/highway" target="_blank">Highway 403. This left a local section of 3/info/highway" target="_blank">Highway 3 on Windsor surface streets as a bottleneck, however this will be bypassed by the 3/info/highway" target="_blank">Highway 401 extension (Windsor–Essex Parkway) to the Gordie Howe International Bridge to Detroit in 2025.
History
= Talbot Trail
=The history of 3/info/highway" target="_blank">Highway 3 dates back over 200 years to the pioneering settlement era of Upper Canada following the American Revolution and the resulting influx of United Empire Loyalists. Thomas Talbot, an influential scion who joined the British army at the age of 11, would challenge the government, the terrain, and the forces of nature to see to it that his road be built. Due to his family legacy, Talbot worked through the ranks quickly and found himself a personal aide to John Graves Simcoe, the first Lieutenant Governor of Upper Canada. He returned to England after Simcoe fell ill, but vowed to return to the hinterland he had come to love.
After completing his military commission, Talbot returned to Upper Canada in 1801 at the age of 30. Although Simcoe had promised Talbot 5,000 acres (20,000,000 m2) of land in Yarmouth Township on the shoreline of Lake Erie, he had not made it official. Talbot returned to England in 1802 and spoke to the legislature, promoting his concept of a vibrant farming settlement. The government granted Talbot his land and promised an additional 200 acres (81 ha) for each family that settled a 50 acres (20 ha) lot in the original grant. Talbot returned to Upper Canada in 1803 with four families and a letter from Lord Hobart authorizing his grant, and established what is now the town of Port Stanley. Wishing to expand his grant and create his ideal colony, Talbot sought out new settlers; a road was required.
Talbot received a grant of $250 in September 1804 for the construction of a road between Brantford and Delhi. John Bostwick would survey the route that year; however, funding shortages would halt construction in 1806.
Talbot approached the new Lieutenant Governor – Francis Gore – in 1808 with the intent of persuading him to fund the building of the road. He insisted that a road would increase the value of the land in the surrounding townships, as well as providing a greater incentive for newcomers to settle in what was otherwise a desolate wilderness. Gore instructed deputy surveyor Mahlon Burwell to "Build a road one chain wide, laid out on the principle of Yonge Street with lots on each side." Burwell began this work in 1809 westward from Delhi. In 1811, he was tasked with surveying the West Talbot Road from Talbotville Royale to Amherstburg. By then, a road was already opened between Port Talbot and Talbotville Royale.
Construction of the new road proved far more difficult than first imagined. Workers followed an old Native American trail, wholly consumed by nature, between Delhi and Port Talbot. To get across the numerous swamps, felled trees were laid across the path to create a corduroy road, much to the chagrin of settlers. The outbreak of the War of 1812 would temporarily halt further construction. When it resumed in 1816, Talbot himself began directing the surveyor, ordering that the road remain on the highest ground possible. This led to an irregular and winding route between Aylmer and Delhi. By 1830, the corduroy logs had been removed and the road improved and extended from Amherstburg to Canborough.
= Niagara trails
=East of Canborough, 3/info/highway" target="_blank">Highway 3 follows several early settlement trails: Forks Road between Dunnville and Chambers Corners, Sherk's Road through Port Colborne to Gasline, and the military Garrison Road through Fort Erie. These roads predate the land survey grid of concession roads and sidelines, which would be used by the provincial government to make 3/info/highway" target="_blank">Highway 3 a continuous route through the Niagara Peninsula where none previously existed.
Forks Road, a river road following Forks Creek, served to connect the Grand River at Dunnville with the Welland River west of Welland. Like many early roads in Upper Canada, it was built along a river bank. It can therefore be assumed that this trail was built prior to the completion of the Feeder Canal in 1832.
Sherk's Road was built at the request of Elias Sherk (d. 1893) in 1858 to connect his house (the historic Danner House) with his and Michael Gondor's properties. The irregular road connected the Welland Canal at Humberstone (now Port Colborne) to the community of Ridgeway, where it met the west end of the Garrison Road. That road was built due to the threat of American attack to provide quick access from Fort Erie, and, like other military roads in Upper Canada (e.g. Dundas Street or Yonge Street), it travelled in a straight line, in this case parallel to the Lake Erie shoreline.
= Provincial 3/info/highway" target="_blank">Highway Network
=Until 1918, the majority of the primary roads through southern 3/info/ontario" target="_blank">Ontario formed part of the County Road System. The Department of Public Works and Highways paid up to 60% of the construction and maintenance costs for these roads, while the counties were responsible for the remaining 40%. In 1919, the federal government passed the Canada Highways Act, which provided $20,000,000 to provinces under the condition that they establish an official 3/info/highway" target="_blank">highway network; up to 40% of construction costs would be subsidized. The first network plan was approved on February 26, 1920, and included the Talbot Road. The majority of what would soon become 3/info/highway" target="_blank">Highway 3 was designated several months later in August. However, it would not receive a route number until the summer of 1925.
Four significant changes to 3/info/highway" target="_blank">Highway 3 have taken place since the designation of the route in 1920. The first was an adjustment to the eastern terminus. The second was the Essex Bypass, built through the 1970s between Windsor and Leamington. The third was the St. Thomas Expressway, a super two 3/info/highway" target="_blank">highway built in the late 1970s. The final change was the provincial 3/info/highway" target="_blank">highway transfers conducted in 1997 and 1998 that resulted in three segments of 3/info/highway" target="_blank">Highway 3 being decommissioned: between Leamington and Talbotville Royale, through Port Colborne and within Fort Erie.
3/info/highway" target="_blank">Highway 3 originally ended at the Honeymoon Bridge in Niagara Falls; it continued east of Chambers Corners along Forks Road (Regional Road 23) rather than south through Wainfleet as it does today. It then travelled north through Welland and east along Lundys Lane. 3/info/highway" target="_blank">Highway 58 and 3/info/highway" target="_blank">Highway 20 would later follow portions of this route. As part of the "spirit of cooperation" that inundated Canada and the US following World War I, as well as to celebrate a century of peace, a new bridge was planned between Fort Erie and Buffalo alongside the international railway crossing. Construction began in 1925; the completed bridge opened to traffic on June 1, 1927. Two months later, on August 7, the bridge was formally dedicated as the Peace Bridge by US Vice President Charles Dawes, and Edward, Prince of Wales.
Traffic patterns quickly shifted to take advantage of the new crossing and the bypass of Niagara Falls that it provided. In foresight of this, the Department of Public Highways took control of a Welland County road between Chambers Corners and Fort Erie on May 11, 1927. This roadway, which followed a significant portion of Sherk's Road and the Garrison Road, in addition to a concession road built west from Port Colborne and north through Wainfleet village, was designated as 3/info/highway" target="_blank">Highway 3A. The following year it was surfaced with concrete and a new bridge built over the Welland Canal in Port Colborne. The new route became so popular that in 1929 the 3/info/highway" target="_blank">Highway 3 and 3/info/highway" target="_blank">Highway 3A designations were swapped.
In the early 1970s, as part of a review to determine the future route of 3/info/highway" target="_blank">Highway 406 south of Welland, proposals arose for a bypass of 3/info/highway" target="_blank">Highway 3 from east of Dunnville to Port Colborne near 3/info/highway" target="_blank">Highway 58.
= Essex Bypass
=The Essex Bypass was opened in stages in the 1970s and early 1980s. Plans were completed in 1968 as part of a province-wide program to bypass small towns on busy provincial highways. The first stage, opened by 1972, began west of Maidstone and passed south of Essex, where it then routed along Malden Road to its former alignment (now Essex County Road 34). Construction of an eastward extension to Ruthven was underway by 1982, and completed in 1983, with the road following Union Road to the old alignment. Construction of a final extension, from Union Road north of Ruthven to past 3/info/highway" target="_blank">Highway 77 on the northern fringe of Leamington, was underway in late 1998; it opened in early December 1999. Although the Leamington Bypass was constructed by the Ministry of Transportation (MTO), the 1.1-kilometre (0.68 mi) segment east of 3/info/highway" target="_blank">Highway 77 to County Road 34 (Talbot Road) was never a part of 3/info/highway" target="_blank">Highway 3 or the provincial 3/info/highway" target="_blank">highway network. It is signed as Essex County Road 33, as Leamington is planning to link the discontinuous segments of County Road 33 with the East Side Arterial Road.
The Essex Bypass, completed around the village of Essex in 1972, was designed to accommodate future widening to a divided four lane road when traffic volumes warranted. By the mid-1990s, a regular pattern of fatalities were occurring, prompting local politicians and Essex Member of Provincial Parliament (MPP) Bruce Crozier to lobby the MTO widen the route. It was announced in June 2006 that the entire 33 kilometres (21 mi) bypass would be widened to four lanes with a grassy median separating the opposing flows of traffic. The three phase project began in September 2007 with a 6.4 kilometres (4.0 mi) stretch between Maidstone and County Road 8 west of Essex. The four-laned 3/info/highway" target="_blank">highway opened in June 2009 at a cost of C$20.7 million. The C$22.1 million second phase involved widening the 3/info/highway" target="_blank">highway between Walker Road and Maidstone to a five lane cross-section, and began in mid-November 2009. It was completed in early 2012. Despite concerns raised by Crozier in 2006 that the project would be halted after the first phase, which were dismissed at the time, no further work has actually been completed on the Essex Bypass since 2012, and the section between Essex and Ruthven remains a two lane 3/info/highway" target="_blank">highway. It is still considered as a future project by the MTO, with no time line set. Three months after Crozier's unexpected death on June 3, 2011, the entire Essex Bypass was renamed the Bruce Crozier Way in honour of his commitment to the widening of the 3/info/highway" target="_blank">highway.
In 2021, construction was underway to twin the segment of the Essex Bypass running next to the Town of Essex, including replacing the signalized intersection with Victoria Avenue and N. Malden Road with an underpass, which was completed by fall 2023. On June 2, 2023, construction started to twin 15.6 kilometres of the Essex Bypass, from 1.2 km east of Essex Road 23 (Arner Townline) easterly to 1.1 km east of Essex Road 34 (Union Avenue). [1][2]
= St. Thomas Expressway
=The St. Thomas expressway was built along the northern edge of that city beginning in 1974. It features six overpasses and a single interchange, at First Avenue. A ribbon cutting ceremony was held on September 7, 1981 to officially open the new route, which bypassed the former 3/info/highway" target="_blank">Highway 3 alignment along Talbot Street and the short concurrency with 3/info/highway" target="_blank">Highway 4 (Sunset Drive). The bypass cost C$16.5 million to construct, and features a two-lane roadway with allotted space on the north side for a second two-lane roadway. Plans originally called for the expressway to extend further east to New Sarum and later even as far as Aylmer, but these have never materialized.
= Downloads to municipalities
=Aside from the Essex Bypass and St. Thomas Expressway, 3/info/highway" target="_blank">Highway 3 remained generally unchanged between the 1930s and late 1990s. However, budget constraints brought on by a recession in the 1990s resulted in the Mike Harris provincial government forming the Who Does What? committee to determine cost-cutting measures in order to balance the budget after a deficit incurred by former premier Bob Rae. It was determined that many 3/info/ontario" target="_blank">Ontario highways no longer served long-distance traffic movement and should therefore be maintained by local or regional levels of government. The MTO consequently transferred many highways to lower levels of government in 1997 and 1998, removing a significant percentage of the provincial 3/info/highway" target="_blank">highway network.
3/info/highway" target="_blank">Highway 3 served as one of the principal highways through southwestern 3/info/ontario" target="_blank">Ontario, since this Detroit–Buffalo route is more direct with a shorter distance than using the below-mentioned 400-series highways, and furthermore 3/info/highway" target="_blank">Highway 3 does not have to climb the Niagara Escarpment unlike parallel portions of 3/info/highway" target="_blank">Highway 403 (the Chedoke Expressway section) and the QEW. Nonetheless, due to traffic preference for higher-speed freeways which have in turn received more upgrades and extensions, 3/info/highway" target="_blank">Highway 3 had been largely supplanted by the combination of 3/info/highway" target="_blank">Highway 401 (segments which have been widened since the 1990s), 3/info/highway" target="_blank">Highway 403 (particularly the completion of the Woodstock-Brantford-Ancaster sections in 1997 which makes for a continuous express link), and the QEW as a through-route. As a result, portions of 3/info/highway" target="_blank">Highway 3 through the Regional Municipality of Niagara were transferred to the region on April 1, 1997, including a 3.4-kilometre (2.1 mi) segment through Port Colborne (most of which had existed as a Connecting Link) and a 5.6-kilometre (3.5 mi) segment in Fort Erie. To the west, a segment of the route paralleling 3/info/highway" target="_blank">Highway 401 between Leamington and Talbotville Royal was decommissioned on January 1, 1998 and transferred to Essex County, Chatham–Kent and Elgin County. It has since been designated as Essex County Road 34, Chatham–Kent Road 3 and Elgin County Road 3.
In 2001, the MTO considered renumbering the western segment of 3/info/highway" target="_blank">Highway 3 as 3/info/highway" target="_blank">Highway 103 to avoid confusion. However, this never came to pass due to opposition from Windsor city councillors.
= Windsor–Essex Parkway
=3/info/highway" target="_blank">Highway 401 did not originally have direct access to the Canada–United States border, as upon entering the Windsor city limits the route terminated at a split interchange with 3/info/highway" target="_blank">Highway 3 where the freeway defaulted onto Talbot Road. Traffic continuing to the border had to follow the non-express 3/info/highway" target="_blank">Highway 3 routing along Talbot Road and Huron Church Road which had a dozen traffic lights. The approach to the Ambassador Bridge was heavily built up making it impractical to twin this crossing and reconstruct the approach as a freeway to cope with cross-border traffic growth, even though Ambassador Bridge owner Matty Moroun had long lobbied for this solution, making this the focus of controversy since the mid-1990s and early 2000s. Numerous attempts by local and provincial politicians since then have led the MTO to begin remedying the situation by constructing an extension of 3/info/highway" target="_blank">Highway 401 (initially known as the Windsor–Essex Parkway, eventually designated as the Rt. Hon. Herb Gray Parkway) to a new international crossing.
In 2004, a joint announcement by the federal government of the United States and Government of Canada confirmed that a new border crossing would be constructed between Detroit and Windsor. The Detroit River International Crossing (DRIC) was formed as a bi-national committee to manage the project. The MTO took advantage of this opportunity to extend 3/info/highway" target="_blank">Highway 401 to the international border and began an environmental assessment on the entire project in late 2005.
Initial construction of a noise barrier from North Talbot Road to Howard Avenue began in March 2010. Full construction began on August 19, 2011, with an expected completion date of mid-2015 for the first phase and 2015-16 for the remainder of the parkway. In early 2015, it was announced that the parkway would open to traffic between 3/info/highway" target="_blank">Highway 3 and Labelle Street (near the E.C. Row Expressway) in the spring. The existing segment of 3/info/highway" target="_blank">Highway 3 (Talbot Road and Huron Church Road) from the E. C. Row Expressway to just east of Outer Drive was realigned to free up right-of-way for the 3/info/highway" target="_blank">Highway 401 extension which was built below-grade in a trench with tunnels to cross underneath surface streets (including those carrying the 3/info/highway" target="_blank">Highway 3 routing). The old split interchange between 3/info/highway" target="_blank">Highway 3 (Talbot Road) and 3/info/highway" target="_blank">Highway 401 was replaced by an all-direction junction incorporating a roundabout, from which a new alignment of Talbot Road bypassed the intersection with Outer Drive (which had traffic lights added in 2006) just each of the former split. The 3/info/highway" target="_blank">Highway 401 extension runs parallel to (but does not replace) 3/info/highway" target="_blank">Highway 3 until the E. C. Row Expressway. After an interchange to 3/info/highway" target="_blank">Highway 3 and Labelle Street, the 3/info/highway" target="_blank">Highway 401 extension then changed direction where it runs parallel westward for 2 km (1.2 mi), then it turned northwest and follow a new alignment to the under-construction Gordie Howe International Bridge (formerly the Detroit River International Crossing and the New International Trade Crossing) border crossing.
= Cayuga bridge replacement
=Work was done in Cayuga to install a new crossing over the Grand River, replacing the five-span steel structure that previously served traffic since 1924. The new concrete structure was opened to traffic on June 20, 2014, and the former structure was demolished after that. On November 4 and December 4 of that year, construction on the bridge was halted by the Haudenosaunee Confederacy Chiefs Council on the claim that the structure impeded on land reserved for a towpath along the Grand River by the Six Nations of the Grand River First Nation. The remaining work included a scheduled three-day closure during which the new bridge was jacked 5 metres (16 ft) north to align with the former structure, as well as decorative work.
Work was completed in the autumn of 2015.
Future
On August 12, 2019, the MTO announced its intention to expand 3/info/highway" target="_blank">Highway 3 within Essex County by "twinning" the existing two-lane 3/info/highway" target="_blank">highway with a second carriageway.
Early construction work is underway as of March 2021 to twin approximately 6 km (3.7 mi) of 3/info/highway" target="_blank">Highway 3 around the town of Essex, including interchange improvements at Essex County Road 8 (Maidstone Avenue), and a grade-separation at North Malden Road / Victoria Avenue.
Further expansion from east of Essex to Leamington is currently under detailed design and engineering.
Major intersections
The following table lists the major junctions along 3/info/highway" target="_blank">Highway 3, as noted by the Ministry of Transportation of 3/info/ontario" target="_blank">Ontario.
See also
List of roads in Essex County, 3/info/ontario" target="_blank">Ontario
References
Footnotes
Bibliography
Brown, Ron (2009). The Lake Erie Shore: 3/info/ontario" target="_blank">Ontario's Forgotten South Coast. Dundurn Press. ISBN 978-1-55488-388-2. Retrieved August 27, 2012.
Shragge, John; Bagnato, Sharon (1984). From Footpaths to Freeways. 3/info/ontario" target="_blank">Ontario Ministry of Transportation and Communications, Historical Committee. ISBN 0-7743-9388-2.
Stamp, Robert M. (1987). QEW – Canada's First Superhighway. The Boston Mills Press. ISBN 0-919783-84-8.
Stamp, Robert M. (1992). Bridging the Border: Structures of Canadian–American Relations. Toronto: Dundurn Press. ISBN 1-55002-074-9.
External links
3/info/highway" target="_blank">Highway 3 at OntHighways.com
Kata Kunci Pencarian:
- Oakville, Ontario
- Prescott, Ontario
- U.S. Route 28
- Jalan Raya Trans-Kanada
- Jalan pos
- Amerika Serikat
- Greater Sudbury
- Jalan Raya Pan-Amerika
- Shannonville Motorsport Park
- Konser Live 8 di Barrie
- Ontario Highway 3
- Ontario Highway 401
- Ontario Highway 407
- Ontario Highway 48
- Ontario Highway 11
- Ontario Provincial Highway Network
- Ontario Highway 2
- Ontario Highway 427
- Ontario Highway 404
- Ontario Highway 400