- Source: Shanghai Metro AC05
The 04A01 train (formerly known as AC05) is a current rolling stock used on Line 4 of Shanghai Metro. They are developed by Siemens Mobility and built by CSR Zhuzhou Locomotive. AC05s entered service on 31 December 2005.
Between July 2006 and September 2009, eight AC05 trains were temporarily assigned to Line 2 service, due to the shortage of AC02 trains, the delayed delivery of AC08 trains and the opening of Line 2 extension. In 2014, AC05 trains renamed 04A01 trains.
Overview
The AC05 trains have livery in purple and white, with the number "4" on every car, to help passengers distinguish the AC03 trains at Line 3 section.
In March 2002, Siemens Mobility and CSR Zhuzhou Locomotive awarded the contract to build AC05 trains for the Pearl line Phase 2 project. The first train built by CSR Zhuzhou Locomotive was completed on 18 December 2004.
Signalling upgrade
Between 2023 and 2025, all 04A01s were modified by Shentong Metro. Trains' signalling system were upgraded from ATO to TACS and every car's indicators were increased from two to four. 04A01s' have also received new LCD screen displays. The LED display's color was changed from orange to red.
See also
Shanghai Metro AC01 and AC02 – 01A04 expansion cars used the same design.
References
Kata Kunci Pencarian:
- CRRC Zhuzhou Locomotive
- Shanghai Metro AC05
- CRRC Zhuzhou Locomotive
- Line 4 (Shanghai Metro)
- Shanghai Metro AC03
- Shanghai Metro AC01 and AC02
- Shanghai Metro rolling stock