- Source: Shishumar-class submarine
The Shishumar-class submarines are diesel-electric attack submarines, currently in active service with the Indian Navy. These submarines are an Indian variant of the Type 209 submarines developed by the German yard Howaldtswerke-Deutsche Werft under the internal designation "Type 1500". The first two vessels were built by HDW at Kiel, Germany, while the remainder were built by Mazagon Dock Limited, at Mumbai, India, under a technology transfer agreement. The submarines were commissioned between 1986 and 1994. These submarines have a displacement of 1,660 tons when surfaced, a speed of 22 knots (41 km/h; 25 mph), and a complement of 40 including eight officers.
The Shishumar class is unique among Type 209s for having an IKL-designed integrated escape sphere. The sphere has accommodations for the entire crew with an eight-hour air supply.
The submarines form the 10th Submarine Squadron at INS Vajrabahu, Mumbai.
History
India signed the agreement for these submarines with Howaldtswerke-Deutsche Werft (HDW) on 11 December 1981. The agreement called for building of two submarines in West Germany, the supply of knocked-down kits for assembling two more submarines in Mazagon Dock Limited (MDL), and training for construction and logistics services. An agreement was announced in 1984 for the construction of two additional submarines in MDL, but was subsequently cancelled due to economic crisis in the late 1980s. The four submarines that were finally built form the 10th submarine squadron based at Mumbai.
Mid Life Upgrade
The Indian Navy awarded a $151 million contract for mid-life upgrade and certification of INS Shishumar in 2018. The refit was carried out by MDL at Mumbai with technical cooperation from ThyssenKrupp Marine Systems. The refit was planned to be completed by 2021 with a similar upgrade for another vessel of Shishumar-class submarine to follow. The ship was expected to be delivered by 2021 but owing to Covid-19 delays the ship will now be delivered to the Indian Navy in August 2023.
Similarly, a second mid-life upgrade contract was awarded to the Mazagon Dock for refit and life certification of the 2nd submarine Shankush on 30 June 2023. The completion date of mid-life upgrade and certification is 2026. The total estimated cost to be around ₹2,725 crore (US$330 million).
Total 3 ships out of 4 will undergo mid-life refit and certification, this will extend the life of the submarine by 10–15 years.
One of the submarine participated in Exercise Malabar 2024 which was held from 8 to 18 October.
Two of these submarines were deployed alongside INS Vikrant along with 7 frontline warships and 4 submarines (Kalvari class and Sindhughosh class) on 7 November 2024. The operations included carrier operations of MiG-29K, missile firing drills, submarine manoeuvres and flypasts by 30 aircraft demonstrated to the President of India Droupadi Murmu who was present on board INS Vikrant.
Ships of the class
Commissions received during the order
In a July 2005 interview with NDTV, V. P. Singh said that in 1987, while he was a minister, he had received a telegram from the Indian ambassador in Germany with the information that Indian agents had received large illegal commissions in the HDW submarine deal. Singh informed the then prime minister Rajiv Gandhi about this and instituted an enquiry. Subsequently, this led to differences and Singh decided to resign from the cabinet.
See also
List of active Indian Navy ships
References
External links
Bharat Rakshak
Global Security
Hellenic Navy's Submarine OCEANOS (S-118) 3d animation
Kata Kunci Pencarian:
- Kapal selam Tipe 209
- Shishumar-class submarine
- Type 209 submarine
- INS Shishumar (S44)
- S5-class submarine
- Kalvari-class submarine (2015)
- Arihant-class submarine
- Mazagon Dock Shipbuilders
- INS Shalki (S46)
- Charlie-class submarine
- Escape pod