- Source: Treherbert railway station
Treherbert railway station serves the village of Treherbert in Rhondda Cynon Taf, Wales. It is the northern terminus of the Rhondda Line.
History
A station was first opened on this site by the Taff Vale Railway on 12 January 1863, and was the connecting point of the Rhondda and Swansea Bay Railway with the collieries of the Rhondda Fawr via a 1-mile 1683 yard tunnel (completed in 1890) which was one of the longest in South Wales. The TVR had opened its Rhondda Fawr branch from Dinas (north of Pontypridd) in 1856 (to serve the Marquess of Bute's newly opened colliery) and began running passenger trains to the town seven years later.
Services over the R&SB via Aberavon to Swansea ended in December 1962, but the route through the Rhondda Tunnel and on to Maesteg and Bridgend via a connection at Cymmer Afan (over the Llynvi and Ogmore Railway) remained open until 1968, when the tunnel was closed due to roof distortion caused by mining subsidence. A replacement bus service then operated to Cymmer until the L&O route was formally closed to passenger traffic in June 1970. The tracks northwards remained in use for mineral traffic to the collieries at Blaenrhondda until 1978, but have since been lifted.
The TVR route towards Porth was singled in stages between 1972 and 1981 (with the portion from here as far as Cwmparc signal box the first to be so treated) and today only one platform remains. There is no longer a run round loop still in existence north of the station (part of the old line to Cymmer Afan). There are four carriage sidings for the Transport for Wales DMU fleet (several of which are stabled & serviced here overnight & at weekends).
Services
The basic service pattern on the route provides a departure every 30 minutes during the day Mondays to Saturdays, dropping to hourly in the evening. Trains run to (and terminate at) Cardiff Central via Porth, Radyr and Cardiff Queen Street, serving all stations except Trefforest Estate en route. One early morning service continues to Penarth. On Sundays, the frequency is two-hourly, but services run through to Barry Island. On 20 July 2018, previous franchise operator Arriva Trains Wales announced a trial period of extra Sunday services on the Rhondda Line to Cardiff and Barry Island. This was in response to a survey by Leanne Wood and the success of extra Sunday services on the Merthyr Line and the Rhymney Line. Services are operated using Class 150 Diesel Multiple Units.
The service from this station was suspended from April 2023 to February 2024, due to major route upgrade work being carried out at multiple locations as part of the Valley Lines electrification scheme. A replacement bus service was in operation from here to Pontypridd, calling at all local stations. Rail services resumed on 26 February 2024, ahead of the introduction of new rolling stock later in the year.
References
Bibliography
Butt, R. V. J. (October 1995). The Directory of Railway Stations: details every public and private passenger station, halt, platform and stopping place, past and present (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN 978-1-85260-508-7. OCLC 60251199. OL 11956311M.
External links
Train times and station information for Treherbert railway station from National Rail
Kata Kunci Pencarian:
- Treherbert railway station
- Treherbert
- List of terminal railway stations in Great Britain
- Rhondda line
- Cathays railway station
- Ynyswen railway station
- Porth railway station
- Llwynypia railway station
- Treorchy railway station
- Trehafod railway station