agra metro
Video: agra metro
Agra Metro GudangMovies21 Rebahinxxi LK21
The Agra Metro is a rapid transit system in Agra, Uttar Pradesh, India. The metro is owned and operated by the Uttar Pradesh Metro Rail Corporation (UPMRC). It is set to consist of two metro lines, with a total length of 29.65 kilometres (18.42 mi) and 27 stations. The Agra Metro is one of five rapid transit system in Uttar Pradesh, the others being the Lucknow Metro, Meerut Metro, Kanpur Metro, and Noida Metro.
History
As of July 2016, DPR has been prepared by RITES and submitted to the state government.
On 28 February 2019, Union Cabinet approved the metro project in Agra worth ₹ 8379.62 crore.
6 March 2024: Prime Minister Narendra Modi inaugurated the first stretch of Agra Metro Project.
Project highlights
The cost of construction is estimated at ₹350 crore per km. The cost will be evaluated based on the June 2015 price index.
Agra Metro Rail Project will have two corridors that will pass through the heart of the city and will connect prominent tourist places including Taj Mahal, Agra Fort, and Sikandra as well as ISBT, Raja Ki Mandi railway station, Medical College, Agra Cantonment railway station, Collectorate, Sanjay Place, and surrounding densely populated residential areas.
Highlights of these corridors include:
The length of Sikandra to Taj East Gate corridor 14.00 km, which is partly elevated and partly underground and comprises 13 stations (6-Elevated and 7-Underground).
The length of Agra Cantt to Kalindi Vihar corridor is 15.40 km comprising 14 stations all elevated.
The estimated cost of the project is ₹8,379.62 crore and the project will be completed in five years.
About 20 lakh population of the city is expected to be benefited by Agra Metro Rail Project directly and indirectly at the time of commencement of commercial operations.
The proposed corridors will be having multimodal integration with railway stations and BRTS stations and will have a feeder network of bus, intermediate public transport (IPT), and non-motorized transport (NMT). The project will have non-fare box revenue from rental and advertisement as well as value capture financing (VCF) through the mechanism of transit-oriented development (TOD) and transfer of development rights (TDR).
The Agra Metro became operational on 6 March 2024.
Route network
= Phase 1
=In Phase 1, 14 metro stations will be built on the Yellow Line (Line 1) from Sikandra to Taj East Gate and 15 metro stations will be built on the Blue Line (Line 2) from Agra Cantt to Kalindi Vihar.
= Current phases
== Current network
=Rolling stock
In 2020, Bombardier Transportation won the contract to supply the rolling stock and the signalling system, and the project received conditional clearance from the Supreme Court. However the contract was cancelled and Alstom was chosen to supply the rolling stock for the Yellow line. The rolling stock belongs to the Alstom Movia family, and resembles those that run on the Kanpur Metro. On 6 March 2023, the first set of coaches arrived at the Taj Station of the Yellow line from Alstom's manufacturing facility at Savli in Gujarat.
Construction progress
The Agra Metro project faced initial setbacks, with its Detailed Project Report (DPR) rejected in 2017 but later approved in 2019, leading to the foundation stone being laid in March 2019. Construction progressed through multiple phases, culminating in a trial run in July 2023 and the inauguration of the priority corridor by Prime Minister Narendra Modi on 6 March 2024.