- High Speed 2 Phase Two
- High Speed 2
- History of High Speed 2
- Bangkok–Nong Khai high-speed railway
- High-speed rail in Turkey
- California High-Speed Rail
- Construction of California High-Speed Rail
- Haramain High Speed Railway
- Route of California High-Speed Rail
- Florida High-Speed Corridor
- High Speed 2 - Wikipedia
- History of High Speed 2 - Wikipedia
- High Speed 2
- Project rescoping: Phase Two cancellation - HS2
- High Speed Two – HS2 - AECOM
- High Speed Two Phase Two management case - GOV.UK
- High Speed 2, Phase 2 – a flagship UK rail project
- High Speed Two: Phase 2b: Design Refinement Consultation …
High Speed 2 Phase Two GudangMovies21 Rebahinxxi LK21
High Speed 2 was a planned new high-speed railway line connecting London with the city centres of Birmingham, Manchester and Leeds directly on new high speed track. East Midlands Airport would also have been served.
Phase 2 was planned for completion in 2032–33, however it was cancelled on 4 October 2023.
Phase two was split into two sub-phases:
Phase 2a: the section from Birmingham to Crewe, which was to be built simultaneously with phase 1, effectively merging with phase 1
Phase 2b: the remainder of phase 2
The concept of HS2 was that all major cities covered would have a city centre HS2 station. Liverpool, along with London, Birmingham, Manchester and Leeds, was envisaged to have a city centre HS2 station. The scheme was cut down to only three provincial city centres served directly by HS2, two being on phase 2. The preliminary route for Phase Two was announced on 28 January 2013. It was envisaged construction on Phase Two will start in 2022 with completion by 2032.
Birmingham to Manchester (phases 2a & 2b)
= Birmingham to Crewe (phase 2a)
=Birmingham to Crewe was phase 2a, which was proposed to be built before phase 2b, simultaneously with phase 1. HS2 was to pass through Staffordshire and Cheshire, in a tunnel under Crewe station but not stopping at Crewe railway station. However, the HS2 line was to be linked to the West Coast Main Line via a grade-separated junction just south of Crewe, enabling "classic compatible" trains exiting the high-speed line to call at the existing Crewe station.
High-speed Crewe hub (phase 2a)
In 2014 David Higgins, who was then chairman of High Speed Two (HS2) Limited, proposed an addition to phase two: a high-speed hub at Crewe to take advantage of, and have access to, the six classic lines radiating from the existing Crewe junction. Many more regions and cities would have overall superior journey times being accessed with a combination of HS2 and classic lines. The hub was a part of phase two, but Higgins proposed the hub and line from Birmingham to Crewe (phase 2a) should be constructed simultaneously with phase one.
Crewe is a major rail junction with six radiating classic lines from the junction to Scotland/Liverpool, Birmingham/London, Chester, Shrewsbury, Stoke and Manchester. The high-speed hub was to be sited to the south of the current Crewe station. The intention was for high-speed trains to run off the northbound HS2 line into the high-speed hub and out onto a number of classic lines without passing through the bottleneck of the existing Crewe station, keeping line speeds as fast as possible. A new high-speed rail station was proposed as a part of the hub.
On 17 July 2017, this was approved by the government.
= Manchester Airport (phase 2b)
=A station is planned to serve Manchester Airport on the southern boundary of Manchester. It will be located next to Junction 5 of the M56 motorway on the northern side of the airport and approximately 1.5 miles (2.4 km) north-west of Manchester Airport railway station. The two stations are not connected. An airport station was recommended by local authorities during the consultation stage. The government agreed in January 2013 for an airport station but agreed only on the basis that private investment was involved, such as funding from the Manchester Airports Group to build the station. The average journey from London Euston to Manchester Airport would be 59 minutes.
= Manchester city centre (phase 2b)
=The route was to continue from the airport into Manchester city centre via a 7.5-mile (12.1 km) bored tunnel under the dense urban districts of south Manchester before surfacing at Ardwick. The tunnel was to be the longest rail tunnel to be built in the United Kingdom, surpassing the 6.2-mile (10.0 km) High Speed 1 tunnel completed in 2004. It was anticipated that the stretch from Rostherne in Cheshire to Ardwick would take up to 7 years to construct.
The 7.6 mile twin-bore tunnel would have been at an average depth of 33 metres and trains will travel at 142 miles per hour (229 km/h) through the tunnel. The diameter size of the tunnel is dependent on the train speed and length of the tunnel. It was envisaged both tunnels would be, as an 'absolute minimum', at least 7.25 metres in diameter to accommodate the high speed trains.
Up to fifteen sites were put forward including Sportcity, Pomona Island, expanding Deansgate railway station and re-configuring the disused grade-II listed Manchester Central terminal station building back into a station. Three final sites made the long list: Manchester Piccadilly station, Salford Central station and a newly built station at Salford Middlewood Locks. Three approaches were considered, one via the M62, one via the River Mersey and the other through south Manchester. Both Manchester and Salford City Council recommended routing High Speed 2 to Manchester Piccadilly to maximise economic potential and connectivity rather than building a new station at a greater cost and which could be isolated from existing transport links.
HS2 trains would have terminated at an upgraded Manchester Piccadilly station. At least four new 400-metre-long (1,300 ft) platforms would have been built to accommodate the new high-speed trains in addition to the two platforms which were planned as part of the Northern Hub proposal. It was envisaged Platform 1 under the existing listed train shed would have also been converted to a fifth HS2 platform to reduce cost. However at 242 metres long, it is the shortest platform at the station and fell short of the 400 metre platform required to accommodate High Speed trains. The HS2 concourse would have been connected to the existing concourse at Piccadilly. HS2 would have reduce the average journey time from central Manchester to central London from 2 hours 8 minutes to 1 hour 8 minutes.
= Current status
=On 4 October 2023, all of HS2 Phase 2 was axed by Prime Minister Rishi Sunak. There is currently a pending review for its revival to Manchester.
Birmingham to Leeds (phase 2b)
A new station in the East Midlands was proposed, which may have been a parkway station, to serve Nottingham, Derby and Leicester. The Derbyshire and Nottingham Chamber supported high-speed rail going to the East Midlands but was concerned that a parkway station instead of centrally located city stations would result in no overall net benefit in journey times to existing services. East Midlands Parkway railway station was recently constructed on the Midland Main Line south of Derby and Nottingham. HS2 would have continued north to a station at Sheffield railway station in South Yorkshire (serving Sheffield and surrounding large towns), terminating in West Yorkshire at Leeds railway station.
= Toton Sidings (phase 2b)
== Chesterfield (phase 2b)
== Sheffield Midland (phase 2b)
== Leeds (phase 2b)
=HS2 would have reduced the average journey time from central Leeds to London from 2 hours 20 minutes to 1 hour 28 minutes.
References
Notes
Kata Kunci Pencarian:

High Speed 2 Phase Two - Wikipedia

High Speed Two - Phase One | Jacobs

HIGH SPEED 2 PHASE 2 PROGRESS

Thoughts On Phase 2a Of High Speed Two « The Anonymous Widower

Fillable Online High Speed Two Phase 2a - Guide for Farmers and Growers ...

High Speed 2
High Speed 2 | Modern Railways
High Speed 2 | Museum of the Game® Forums

High Speed 2 on Behance

High Speed 2 on Behance

High Speed 2 on Behance

High Speed 2 on Behance
high speed 2 phase two
Daftar Isi
High Speed 2 - Wikipedia
In 2003, modern high-speed rail arrived in the United Kingdom with the opening of the first part of High Speed 1 (HS1), then known as the 67-mile-long (108 km) Channel Tunnel Rail Link between London and the Channel Tunnel. In 2009, the Department for Transport (DfT) under the Labour government proposed to assess the case for a second high-speed line, which was to be developed by a new c…
History of High Speed 2 - Wikipedia
The history of High Speed 2 is the background to the planned construction of High Speed 2 (HS2), a new high-speed railway in Great Britain that was originally planned to connect …
High Speed 2
Discover HS2, the UK's high-speed rail network transforming travel across the nation. Stay updated with the latest news, project developments, and travel information. Learn how HS2 is …
Project rescoping: Phase Two cancellation - HS2
Oct 1, 2024 · These included cancelling Phase 2 of the project and scaling back the railway to a high-speed line between London Euston and Birmingham Curzon Street. The new line will …
High Speed Two – HS2 - AECOM
High Speed Two (HS2) is a new high-speed railway, essential for achieving net zero carbon emissions targets in the UK, that connects the Midlands with the North and tackles the capacity shortfall on the existing rail and road network.
High Speed Two Phase Two management case - GOV.UK
1.5 Phase One of HS2 will see a new high speed line constructed from Euston to north of Birmingham, where it will re-join the existing West Coast Main Line (WCML). New high speed …
High Speed 2, Phase 2 – a flagship UK rail project
Phase 2b will treble the rail network capacity between Birmingham and Manchester and double the capacity between London and Manchester. When finished, nearly 26,000 passengers will benefit from faster journey times.
High Speed Two: Phase 2b: Design Refinement Consultation …
High Speed Two (HS2) will be transformative for the UK, adding much needed capacity to our rail network, connecting some of our biggest cities and towns and acting as a catalyst for...