Artikel: Sumner Tunnel GudangMovies21 Rebahinxxi

    • Source: Sumner Tunnel
    • The Sumner Tunnel is a road tunnel in Boston, Massachusetts, United States. It carries traffic under Boston Harbor in one direction, from Logan International Airport and Route 1A in East Boston. The tunnel originally deposited traffic at the west side of the North End, but with the completion of the Big Dig, it was modified to have two exits. One exit connects to I-93 northbound and downtown Boston (Government Center) near Haymarket Station. The other exit connects to Storrow Drive and Nashua St., connecting Cambridge via Route 28. Traffic headed for I-93 southbound and the Massachusetts Turnpike (I-90) westbound is normally routed to the Ted Williams Tunnel. It is managed by the Massachusetts Department of Transportation.


      History


      The Sumner Tunnel was opened on June 30, 1934. It carried traffic in both directions until the opening of the parallel Callahan Tunnel in 1961. The Sumner Tunnel is named for William H. Sumner, the son of Governor Increase Sumner.
      Until 2009, it was managed by the Massachusetts Turnpike Authority, when it was transferred to the Massachusetts Department of Transportation.
      As of 2016, a toll of $1.50 is charged for non-commercial two-axle vehicles with a Massachusetts E-ZPass, while non-Massachusetts E-ZPass holders are charged $1.75. Vehicles without E-ZPass are charged $2.05 through MassDOT's Pay by Plate MA program. For residents of certain Boston ZIP Codes, a discount is in effect using an E-ZPass transponder, costing $0.20. On November 14, 2008, the Massachusetts Turnpike Authority voted in favor of a proposed toll hike which would double the toll to $7.00 for non-commercial vehicles (at the time, the toll was $3.50 in the southbound direction only). E-ZPass users would receive a $1.00 discount and commercial vehicles would end up having to pay $9.00. This vote was later rescinded following a vote approving a 1.25% sales tax increase.
      In 2016, cashless tolling systems were installed in both directions, entering the Sumner Tunnel and exiting the Callahan Tunnel as part of a plan to modernize toll collection in the Boston area.
      The tunnel has been shut intermittently for modernization from summer 2022 through summer 2024. It will be fully closed from July 5 and August 5, 2024, and on weekends from August 9 through November 15, except for August 30 and October 11.











      See also


      Big Dig (Boston, Massachusetts)
      Callahan Tunnel
      Massachusetts Turnpike
      Ted Williams Tunnel
      Thomas P. O'Neill Jr. Tunnel
      Zakim Bunker Hill Bridge


      References




      External links


      Sumner Tunnel construction photographs, 1929–1933, University Archives and Special Collections, Joseph P. Healey Library, University of Massachusetts Boston

    Kata Kunci Pencarian:

    sumner tunnelsumner tunnel closuresumner tunnel animesumner tunnel closure 2024sumner tunnel photossumner tunnel tollsumner tunnel closure airportsumner tunnel closure update todaysumner tunnel trafficsumner tunnel accident today