- Milan
- Daftar produsen baja
- Litoral Gas
- Daftar perusahaan di Italia
- Techint
- Technical intelligence
- Tenaris
- List of intelligence gathering disciplines
- Paolo Rocca
- Special reconnaissance
- Roberto Rocca
- 203rd Military Intelligence Battalion
- List of wealthiest families
- Peru LNG
- Techint E&C | Home
- About us - Techint
- Services - Techint
- Techint Careers
- How we do it - Techint
- Techint E&C | Home
- New record in Monterrey: 10 million accident-free hours
- The future of water use in mining in Chile - techint.com
- Markets - Techint
- Energy Transition News
Techint GudangMovies21 Rebahinxxi LK21
Techint is an Italian-Argentine conglomerate founded in Milan in 1945 by Italian industrialist Agostino Rocca and headquartered in Buenos Aires (Argentina) and Milan (Italy).
Techint operates with two main entities: Techint S.A., based in Buenos Aires, and Techint - Compagnia Tecnica Internazionale S.p.A., based in Milan.
Techint owns controlling interests in 6 major companies. Techint owns 62.02% of Ternium, a producer of steel for construction, and 60.45% of Tenaris, the largest producer of steel pipe for the petroleum industry. It also owns Techint Engineering & Construction, which provides operation and management services for complex and large-scale projects; Tenova, which designs technologies and develops services that help metals and mining companies limit environmental impact; Tecpetrol, an energy exploration and production company in Latin America; and Humanitas, which owns health care institutions.
The company is controlled by San Faustin S.A., which is in turn controlled by Rocca & Partners Stichting Administratiekantoor Aandelen San Faustin, a Stichting.
History
The company was formed in September 1945 by as Compagnia Tecnica Internazionale (Italian for "Technical International Company") by Agostino Rocca, an executive at Ansaldo and later at Dalmine and Società Italiana Acciaierie Cornigliano (SIAC) and a major developer of the Italian steel industry in the 1930s. After World War II, Rocca, who opposed the fascist regime in Italy, traveled to Latin America, where he provided engineering and construction services. The company's first large project was building a network of large diameter pipelines in Argentina and Brazil.
In 1949, the company was awarded a contract to build a 1,600 km (1,000 mi) gas pipeline from Comodoro Rivadavia to Buenos Aires by President Juan Perón. Techint became a major government contractor during Perón's ambitious infrastructure program in Argentina. Creating subsidiaries in Brazil (1947), Chile (1951), and Mexico (1954), the company opened its first seamless steel tube plant in Campana, in 1954; in 1969, Techint's Ensenada plant became the only Argentine manufacturer of cold rolled steel.
The name of the company was changed to Techint, its abbreviated telex code.
In the 1980s, projects were undertaken in Argentina, Brazil, Ecuador and Mexico, and the company diversified, building the first nuclear facilities and offshore platforms.
In the early 1990s, Techint purchased a stake in state-owned SOMISA in Argentina. A significant part of Techint's core manufacturing strength has since been concentrated in the San Nicolás de los Arroyos-Villa Constitución oil-and-steel corridor, where the company is involved in the production of cold rolled steel. In those years, Techint invested in oil and gas blocks in Argentina through exploration and production company Tecpetrol.
In the mid 1990s, in Italy, the Techint Group entered the health services sector by building and managing Istituto Clinico Humanitas (ICH), a hospital and medical research institute near Milan.
In December 2001, Techint formed Tenaris to own steel pipe production assets from Siderca.
In August 2005, Techint bought 99.3% of Mexican Hylsamex for US$2.2 billion. It then merged it with Siderar, based in Argentina, and Sidor, based in Venezuela, to form Ternium, headquartered in Luxembourg.
In 2016, Techint entered the mining industry through Tenova's acquisition of several mining companies.
References
External links
Official website
Kata Kunci Pencarian:
Techint | PDF
Techint | PDF
1200px Techint Logo - SVG | PDF

Techint Careers

Techint - Mitrani Caballero

Techint Logo PNG Vector (SVG) Free Download

Techint on Behance
Techint Group | LinkedIn

Techint – Chile | Digital Communications Technologies

Home - Portal Cupa Web

techint - Tilos Americas

Techint by on Prezi
techint
Daftar Isi
Techint E&C | Home
“Techint has top engineering and procurement experts on its team, which means it’s about more than just installing things, and this is what makes a huge difference. The other key point for me is that they really produce results.”
About us - Techint
Techint laid a 650 km multi-pipeline in Nigeria, built the Yanbu-Madinah water transmission system in Saudi Arabia, and erected a range of refineries and processing plants throughout Latin America as well as laying 2,000 km of pipelines in Colombia.
Services - Techint
Delivering a project for which we were hired is a non-negotiable commitment for Techint. We never leave a project unfinished.
Techint Careers
Techint Ingeniería y Construcción. The company provides Project Management, Engineering, Procurement, Construction and Operation services worldwide for large-scale projects in the market segments of Oil & Gas, Energy, Mining and Industrial Plants. View job offers
How we do it - Techint
Regardless of the complexity of the project, Techint E&C guarantees quality, timely delivery. We focus on meeting the needs and expectations of our customers, ensuring the highest standards of safety, quality and transparency.
Techint E&C | Home
“Na Techint não existem limites. Se você quiser crescer e for uma pessoa muito ativa, sempre aparecem oportunidades, no país e no exterior. É uma empresa na qual você vai receber um nível de capacitação que é raro ver no mercado”.
New record in Monterrey: 10 million accident-free hours
Feb 13, 2025 · The CONSER Monterrey team of Techint Engineering and Construction achieved an unprecedented milestone with more than 10 million hours without lost day accidents in the last 6 years. The project, which takes place in a highly challenging environment with simultaneous operations in 10 plants, has seen its team combine efforts to consolidate a ...
The future of water use in mining in Chile - techint.com
Over more than 10 years, Techint Engineering & Construction has evolved from the construction of pipelines to the implementation of integral solutions to guarantee water supply in the mining sector.
Markets - Techint
We also provide services to the Techint Group’s steel and steel pipe companies, including the maintenance of electromechanical equipment and plant facilities, heavy cleaning at steel mills, light industrial cleaning, packaging and conditioning rolled steel …
Energy Transition News
Synergy in the Techint Group Behind the scenes of the first hydrogen trial in Italy’s steel industry. Tenaris is committed to cutting its global CO2 emissions by 30% by 2030, in line with the EU’s Fit for 55 targets.