- Source: 2031 in rail transport
This article lists events related to rail transport that are currently scheduled to occur in 2031. Please be aware that the actual dates on which these events occur may differ substantially from what is shown here.
Events
= Unknown date
=– Planned opening of the Ontario Line in Toronto, Ontario.
– Latest planned opening of the west section of Line 5 Eglinton in Toronto, Ontario.
– Planned completion of the Helsinki–Turku high-speed railway.
– Planned completion of the Delhi–Varanasi high-speed rail corridor.
– Scheduled completion of the Naniwasuji Line in Osaka, which will connect the JR Yamatoji Line (Kansai Main Line) and Nankai Main Line with Shin-Osaka Station.
– Manila LRT 1 to extend to Niog from Dr. Santos.
– Cluj Napoca Metro to start operations between Tara Motilor and Munchii and branch to Depou Sohor.
– Tainan MRT Blue Line to start operations between Rende Carrefour and Rende District with a branch to Shalun Green Energy Science City.
– Planned opening of the first phase of the East San Fernando Valley Light Rail Transit Project in the San Fernando Valley of Los Angeles, California.
– Planned opening of the Skyline extension to Kaʻākaukukui station in Honolulu.
References
Kata Kunci Pencarian:
- Kereta kecepatan tinggi Kuala Lumpur–Singapura
- Shinkansen
- Britania Raya
- Hokkaido Shinkansen
- 2031 in rail transport
- 2032 in rail transport
- 2030 in rail transport
- Delhi–Varanasi high-speed rail corridor
- East San Fernando Valley Light Rail Transit Project
- Ontario Line
- Naniwasuji Line
- North Valley Rail
- Helsinki–Turku high-speed railway
- Pacheco Pass Tunnels