- Source: Central Spine Road
Lingkaran Tengah Utama Expressway, previously known as Central Spine Road (CSR) or Kuala Krai–Kuala Pilah Highway, Federal Route 34, is a new toll-free highway under construction in the center of Peninsular Malaysia. The 325 km (201 miles) highway is built to eventually replace the former two-lane Malaysia Federal Route 8 (Gua Musang Highway) and Malaysia Federal Route 9 (Karak–Tampin highway). Construction of CSR starts at Package 3 which is from Merapoh to Kampung Relong. It commences at Package 3 as the Gua Musang Highway passes through Chegar Perah which is prone to roadkill. The highway has a long eco-viaduct built in this section. Package 5 which is from north Raub to Karak will be built next, which will connect it to E8 Kuala Lumpur–Karak Expressway bypassing Bentong and Mempaga. This will help detour traffic from the steep mountainous grade between Raub and Bentong. It was formerly known as Central Spine Expressway.
History
Phase 1 is a 51 km stretch from Kuala Krai to Jambatan Sungai Lakit in Kelantan.
Phase 2 spans 63 km from Jambatan Sungai Lakit to Gua Musang in Kelantan
Phase 3 covers 107 km from Gua Musang to Kampung Relong in Pahang.
Phase 4 comprises 56 km from Kampung Relong to Raub in Pahang
Phase 5, 54 km from Raub to Bentong
Phase 6, is 47 km and connects Bentong and Simpang Pelangai. (this section is deferred)
On 15 December 2016, section 3H (Kg. Kechur to Kg. Sbrg. Jelai) was opened to traffic. As of July 2024, Package One from Kuala Krai to the Sungai Lakit Bridge is 11.59% complete; Package Two from the Sungai Lakit Bridge to Gua Musang is 22.40% complete. Package Three from Gua Musang to Kampung Relong is 84.25% complete; Package Four from Kampung Relong to Raub is 63.69% complete.
Users can now access Package Five from Raub to Bentong, and Package Six from Bentong to the LPT Junction is 30.07% complete.
Features
Four lanes, two on each side
A long eco-viaduct for wild animals crossing
Some sections are concrete paved
Kilometre markers along the road
In most sections, it is built under JKR R5 road standards, allowing maximum speed limit of up to 90 km/h.
From Kampung Sungai Yu to Chegar Perah and from Chegar Perah to Bukit Tujuh, it overlaps Federal Route 8 Merapoh Highway.
There are no sections with motorcycle lanes.
List of interchanges
References
External links
Central Spine Road on Facebook
Kata Kunci Pencarian:
- Melbourne
- Daftar rumah sakit di California
- Daftar karya tentang Perusahaan Hindia Timur Belanda
- Central Spine Road
- Malacca Strait Bridge
- List of expressways and highways in Malaysia
- List of roads and highways
- Malaysia Federal Route 8
- Malaysian national projects
- Kuala Lumpur Middle Ring Road 2
- List of Federal Roads in Malaysia
- Kota Bharu
- Abbeydale and Abbeymead