- Source: Line 1 (Shijiazhuang Metro)
- Dhaka Metro
- Metro Wuhan
- Metro Delhi
- Manila Metro Rail Transit System
- Shanghai Metro
- Kolkata Metro
- Metro Guangzhou
- Ankara Metro
- Harbin Metro
- Metro Lahore
- Line 1 (Shijiazhuang Metro)
- Shijiazhuang Metro
- Line 3 (Shijiazhuang Metro)
- Line 1 (Mumbai Metro)
- Line 2 (Shijiazhuang Metro)
- Hanoi Metro
- Line 1
- Blue Line (Delhi Metro)
- Shijiazhuang
- CRRC Tangshan
Line 1 of the Shijiazhuang Metro (Chinese: 石家庄地铁一号线; pinyin: Shíjiāzhuāng Dìtiě Yī Hào Xiàn) is a rapid transit line in Shijiazhuang, Hebei province, China. Currently it is 34.3 km (21.3 mi) long with 26 stations. The line opened on 26 June 2017.
History
Phase 1
Phase 1 of the line began construction on 1 July 2013 and began service on 26 June 2017, completed at a cost of ¥18.892 billion.
Phase 2 initial section
The Phase II of Line 1 is 13.495 km (8.4 mi) with 8 stations. Only 6 stations from Xiaohedadao to Fuze (10.4 km) opened on 26 June 2019.
Phase 2 North section
Two more stations, Dongshangze and Dongyang will open later. The section is 3.1 km in length with 2 stations. The section will open in 2024.
Phase 3 (Southwest extension)
The Phase 3 will add two more stations (Huai'anlu and Shangzhuang) in Southwest of the line. The extension is under planning.
= Opening timeline
=Stations
Rolling stock
Services are provided by CRRC Tangshan Type A rolling stock, which are operated in six-car sets that hold up to 2520 passengers each.