- Source: Line 10 (Chengdu Metro)
Line 10 of the Chengdu Metro (simplified Chinese: 成都地铁10号线; traditional Chinese: 成都地鐵10號線; pinyin: Chéngdū Dìtiě Shí Hào Xiàn) runs from Taipingyuan in Wuhou to Xinping in Xinjin. Currently, the line is 37.972 km (23.6 mi) long. In 2024, the line will be 43.9 km long with the 5.9 km northeastern extension (Phase 3) to People's Park.
Phase I of Line 10 began construction in July 2014 and opened in September 2017. Phase II began construction in 2016 and opened on December 27, 2019.
It is the first line in Chengdu Metro to use 6-car Type A rolling stock for service.
Line 10's color is sky blue.
Opening timeline
Stations
Notes
References
Kata Kunci Pencarian:
- Dhaka Metro
- Shanghai Metro
- Metro Delhi
- Bus raya terpadu
- Metro Dubai
- Makkah Metro
- Metro Wuhan
- Metro Guangzhou
- Harbin Metro
- Metro Lahore
- Line 10 (Chengdu Metro)
- Chengdu Metro
- Line 1 (Chengdu Metro)
- Line 6 (Chengdu Metro)
- Line 18 (Chengdu Metro)
- Line 19 (Chengdu Metro)
- Line S5 (Chengdu Metro)
- Line 2 (Chengdu Metro)
- Line 7 (Chengdu Metro)
- Line 17 (Chengdu Metro)