- Source: Line 11 (Beijing Subway)
- Jalur 14, Beijing Subway
- Jalur 4, Beijing Subway
- Jalur Yizhuang, Beijing Subway
- Jalur 15, Beijing Subway
- Jalur 6, Beijing Subway
- Jalur Fangshan, Beijing Subway
- Jalur Daxing, Beijing Subway
- Kereta Bawah Tanah Beijing
- Kereta Bawah Tanah Metropolitan Seoul
- Jalur Metro Bandara Daxing Beijing
- Line 11 (Beijing Subway)
- Line 1 (Beijing Subway)
- Beijing Subway
- Line 2 (Beijing Subway)
- Line 3 (Beijing Subway)
- Line S1 (Beijing Subway)
- Line 10 (Beijing Subway)
- Line 13 (Beijing Subway)
- Line 12 (Beijing Subway)
- Line 6 (Beijing Subway)
Line 11 of the Beijing Subway (Chinese: 北京地铁11号线; pinyin: běijīng dìtiě shíyī hàoxiàn) is a rapid transit line of the Beijing Subway. The line opened between Jin'anqiao and Xinshougang (Shougang Park) on December 31, 2021, and between Jin'anqiao and Moshikou on December 30, 2023. Line 11's color is grapefruit.
Opening timeline
Stations
= Phase 1
=All stations are in Shijingshan.
= Phase 2
=Under Planning.
There are suggestions to add an infill station between Qingta and Lianhuaqiao stations on Phase 2 of Line 11. In July 2024, the infill station, Wanfeng Lu, was confirmed in official news.
History
= Old planning
=In 2006, Line 11 was originally designed as an L-shaped line from Wanliu to Dahongmen, which together with the L-shaped Line 10, form a subway ring route. After Line 10 Phase II took over the entire ring route, Line 11 was displaced.
In January 2010, the government of Shijingshan District disclosed plans for a Line 11 in western Beijing that would traverse the Shougang (Beijing Capital Steel) complex and intersect with Lines 4 and 16.
= Phase 1
=Construction started on November 13, 2019. The western section (Phase 1) of Line 11 (Moshikou station — Xinshougang station), also known as "Winter Olympic Branch Line", is 4.2 km (2.6 mi) in length with 4 stations. It is fully underground.
Jin'anqiao, Beixin'an and Xinshougang (Shougang Park) stations opened on December 31, 2021. Moshikou station opened on December 30, 2023.
= Phase 2
=According to the information released on January 11, 2022, Phase II of Line 11 to Lize Shangwuqu and Yangqiao is included in the "Beijing Rail Transit Phase III Construction Plan". In 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) confirmed that it will be 23.8 km (14.8 mi) long with 17 stations.
On 8 July 2024, a tender announcement modified phase 2 of line 3 to be 17.4 km (10.8 mi) with 14 stations. The section between Lize Shangwuqu and Yangqiao was not approved by the NDRC and removed from the short-term plan. It was announced that Yamenkoudong, Wujiacun, Xiaowayao, Wanfenglu, Lianhuaqiao, Maliandao, Lize Shangwuqu and Tiyuchang Nanjie stations will start constructions.