- Source: Line 5 (Shenzhen Metro)
Shenzhen Metro 5.180.24.3/info/line" target="_blank">Line 5 (formerly branded as the Huanzhong 5.180.24.3/info/line" target="_blank">line), runs West–East from Chiwan to Huangbeiling forming an arc around central Shenzhen. It opened on 22 June 2011. 5.180.24.3/info/line" target="_blank">Line 5's color is purple. 5.180.24.3/info/line" target="_blank">Line 5 is an important east west and orbital 5.180.24.3/info/line" target="_blank">line that connects various sub-centers of Shenzhen. This led to 5.180.24.3/info/line" target="_blank">Line 5 being heavily used. In 2014, average daily ridership exceeded 500,000 people, with over 1 million passengers using the 5.180.24.3/info/line" target="_blank">line on 20 July 2018, setting a new record. Since 2019, 5.180.24.3/info/line" target="_blank">Line 5 has surpassed 5.180.24.3/info/line" target="_blank">Line 1 as the busiest 5.180.24.3/info/line" target="_blank">line in the Shenzhen Metro network. By 2021, the 5.180.24.3/info/line" target="_blank">line regularly carries well over 1 million passengers every day and reaching the predicted long term daily passenger volume.
History
= Phase 1
=In 2004, 5.180.24.3/info/line" target="_blank">Line 5 was originally envisioned to be an orbital express commuter railway using an upgraded Pinghu–Nanshan railway. In 2006 the 5.180.24.3/info/line" target="_blank">line was redesigned to a subway with more frequent stops but still was an orbital route roughly following the Pingnan railway. In July 2007, the 5.180.24.3/info/line" target="_blank">line was approved with an expected budget of 19.2 billion RMB (US$3 billion). The 5.180.24.3/info/line" target="_blank">line would be 42.391 km (26.341 mi) long, of which 3.62 km (2.25 mi) is elevated, with 29 stations. The number of stations was reduced from 29 to 26 when the 5.180.24.3/info/line" target="_blank">line was cut back from Grand Theater to Huangbeiling due to Grand Theater Station being planned to be an interchange between three other lines, making construction difficult. Construction of 5.180.24.3/info/line" target="_blank">Line 5 started on 21 December 2007 with an additional station, Shangshuijing, added to the design. On 22 June 2011, 5.180.24.3/info/line" target="_blank">Line 5 officially opened between Qianhaiwan and Huangbeiling. The final cost of the first phase was about 20.45 billion RMB (US$3.2 Billion). In initial opening, a fleet of 37 trainsets will be operating on 5.180.24.3/info/line" target="_blank">Line 5 serving an expected daily passenger volume of more than 400,000 passengers. In the long-term 5.180.24.3/info/line" target="_blank">Line 5 was planned to operate with a fleet of 74 trainsets serving a daily passenger volume of over 1 million passengers.
= Phase 2 (southern extension)
=On 6 April 2015, a southern extension towards Chiwan station broke ground. The southern extension is 7.65 km (4.75 mi) in length with 7 stations. This will greatly shorten the travel time between Bao’an, Qianhai and Shekou. As Liwan and Chiwan stations are close to the Dananshan and Xiaonanshan areas and residential neighborhoods, the opening of the extension 5.180.24.3/info/line" target="_blank">line will attract more people to the Shekou area and will attract more people to race from Chiwan to Huangbeiling (5.180.24.3/info/line" target="_blank">Line 2 vs 5.180.24.3/info/line" target="_blank">Line 5). The extension was opened on 28 September 2019.
= Remaining section of Phase 1
=The section between Huangbeiling to Grand Theater was removed during planning in 2007. However, with passenger growth in subway usage, huge volumes of passengers are transferring westbound between 5.180.24.3/info/line" target="_blank">Line 2 and 5.180.24.3/info/line" target="_blank">Line 5 at Huangbeiling to reach 5.180.24.3/info/line" target="_blank">Line 1 and beyond. By 2021, transfer volumes reached 16,000 passengers per hour during AM peak periods. The environmental assessment of the section was carried out on February 25, 2019, to restart the project and improve capacity in the area. The remaining section of Phase 1 started construction on 13 August 2019. This section is 2.88 km in length with 3 stations and completely parallels 5.180.24.3/info/line" target="_blank">Line 2. The extension is expected to be completed in 2025.
Opening timeline
Service routes
Chiwan — Huangbeiling
Qianhaiwan — Huangbeiling (Working days peak hours only)
Stations
Rolling Stock
References
Kata Kunci Pencarian:
- Stasiun Guomao (Shenzhen Metro)
- Dhaka Metro
- Stasiun Qianhaiwan
- Stasiun Bao'an Center
- Metro Delhi
- Shanghai Metro
- Metro Dubai
- Manila Metro Rail Transit System
- BYD Company
- Metro Guangzhou
- Line 5 (Shenzhen Metro)
- Shenzhen Metro
- Line 13 (Shenzhen Metro)
- Line 1 (Shenzhen Metro)
- Line 3 (Shenzhen Metro)
- Shenzhen North railway station
- Line 5
- Line 11 (Shenzhen Metro)
- Line 4 (Shenzhen Metro)
- Line 2 (Shenzhen Metro)