- Source: Platteville Subdivision
The Platteville Subdivision, also known as the Galena branch, was a railway line in the states of Illinois and Wisconsin. It ran approximately 46 miles (74 km) from Galena, Illinois, to Montfort, Wisconsin, with a 4-mile (6.4 km) branch from Ipswich, Wisconsin, to Platteville, Wisconsin. The line was initially built by the Galena and Southern Wisconsin Railroad as a 3 ft (914 mm) line; it was subsequently rebuilt as a 1,435 mm (4 ft 8+1⁄2 in) standard gauge line. The line opened in 1874 and was fully abandoned in 1980.
History
The Galena and Southern Wisconsin Railroad began construction of a 3 ft (914 mm) line in 1874 and opened it between Galena, Illinois, and Platteville, Wisconsin, on January 1, 1875. Also serving Platteville was the Dubuque, Platteville and Milwaukee Railroad (a forerunner of the Milwaukee Road), which had opened in 1870.
The company extended the line further north in the direction of Montfort, Wisconsin, in 1877. The line branched off the original line at Ipswich, Wisconsin, 4 miles (6.4 km) east of Platteville. The Galena and Southern Wisconsin Railroad failed in 1879 and was reorganized as the Galena and Wisconsin Railroad, which was unable to complete the line to Montfort.
Under the auspices of the Chicago and North Western Railway, the Chicago and Tomah Railroad, another narrow gauge railroad, built east from Fennimore, Wisconsin, through Montfort and south to the northern end of the Galena and Wisconsin Railroad's line. This connection was completed in 1880. The line between Galena and Fennimore was converted to 1,435 mm (4 ft 8+1⁄2 in) standard gauge in 1882.
The Galena and Wisconsin Railroad and Chicago and Tomah Railroad were consolidated in 1880 as the Milwaukee and Madison Railway. In 1881, this company, along with the Sheboygan and Western Railway and the Chicago and Milwaukee Railway, was consolidated as the Chicago, Milwaukee and North Western Railway. That company was bought in 1883 by the Chicago and North Western Railway. The Chicago and North Western constructed a 2.7-mile (4.3 km) spur to Hazel Green, Wisconsin, in 1907.
Amid bankruptcy reorganization, the Chicago and North Western began abandoning the line in 1939, starting with the section between Galena and Hazel Green Junction in 1939. In 1940, the line was further cut back to Strawbridge, Wisconsin, and the branch line to Hazel Green, Wisconsin, was abandoned entirely. The line was further cut back to Benton, Wisconsin, in 1941. In 1967 it was cut back to Cuba City, Wisconsin, and then abandoned altogether in 1980.
Notes
Footnotes
References
Hilton, George W. (1990). American Narrow Gauge Railroads. Stanford, California: Stanford University Press. ISBN 0-8047-2369-9.
Interstate Commerce Commission (1928). "Interstate Commerce Commission Reports: Decisions of the Interstate Commerce Commission of the United States. Valuation reports". U.S. Government Printing Office.
Kaysen, James P. (1937). The Railroads of Wisconsin, 1827-1937. Boston: Railway and Locomotive Historical Society. OCLC 5577008.
Mailer, Stanley H. (June 1971). "The Ridge Runner". Trains. Vol. 31, no. 8. pp. 24–28. ISSN 0041-0934.
Stennett, William H. (1910). Yesterday and Today: A History of the Chicago and North Western Railway System. Winship Company, Printers.
Kata Kunci Pencarian:
- Platteville Subdivision
- Galena and Southern Wisconsin Railroad
- 2024 NCAA Division III football rankings
- Chicago and Tomah Railroad
- List of United States counties and county equivalents
- List of NCAA football records
- U.S. Route 151
- Baraboo, Wisconsin
- List of municipalities in Wisconsin by population
- Union Pacific 844