- Source: Stansted Airport Transit System
The Stansted Airport Track Transit System (TTS) is a fully automated people mover system which operates within London Stansted Airport in England, United Kingdom.
The transit system conveys air travellers between the main airport terminal and the departure/arrival gates, which are located some distance from the main terminal in satellite buildings 1 and 2. The system operates exclusively "airside", meaning that it can only be accessed by passengers who have first passed through airport security. The transit is provided free of charge, with easy access for disabled passengers and is fully electric, much less polluting than the diesel buses that serve the car parks and remote aircraft stands.
It is planned to decommission and partially demolish the Stansted TTS in the spring of 2026 as part of a redevelopment project, and replace the transit system with pedestrian bridges.
History
The Stansted Airport Transit System was opened in 1991. It was constructed as a result of the decision by the British Airports Authority (BAA) to redevelop the airport with an arrangement of satellite buildings detached from the main terminal. The BAA considered several options for conveying passengers safely and rapidly to the airport gates, including moving walkways, tunnels, bridges and bus links, before opting for an automated tracked transit system. After opening in 1991 the system was extended in 1998 with an additional underground station to serve a second satellite building.
Route
= Guideway
=The Stansted Airport TTS vehicles run along a double-track guideway totalling 3.2 kilometres (2.0 mi) in length which connects the main terminal building with two satellite buildings. The route begins on an elevated section alongside the departure lounge, before entering a tunnel which passes beneath the airport apron. There is an elevated maintenance depot at one end.
= Stations
=The Transit System has three stations: Terminal (arrivals and departures at separate points), Gates 1–19 (Satellite 1 arrivals and departures) and Gates 20–39 (Satellite 2 arrivals and departures). Satellite 3 (Gates 40–59) is not served by the Transit System; instead a pedestrian footway links the gates with the main terminal.
Each station has segregated boarding and alighting platforms, allowing a more efficient passenger flow. All boarding points are equipped with platform screen doors.
Vehicles
5 Adtranz C-100 cars built by Westinghouse for the system, with car bodies built in Scotland by Walter Alexander before being shipped to Pittsburgh for assembly and testing, are still in service today. This was increased to 9 when 4 new Adtranz CX-100 cars were delivered during the 1998 expansion. During normal operation, eight out of the nine cars will be in service to maintain a 99.98% availability record. The cars can operate as single-, double-, or triple-unit trains that can be easily accessed by disabled passengers. The trains are fully automated and driverless, classed as a Grade of Automation level 4 (unattended) system and regulated by the Office of Rail Regulation. The Stansted TTS is currently the world's last remaining APM system to use the Adtranz C-100 rolling stock.
Planned closure
In April 2023, Manchester Airport Group, the owner of Stansted Airport, announced the Airport Route 43 project to expand the airport. As part of this scheme, the Stansted Track Transit System (TTS) will be decommissioned in the spring of 2026.
The decision to decommission the TTS was based on various issues related to its age and operational limitations. Originally designed in the 1980s with an intended lifespan of 20-25 years, the system was already exceeding its expected operational period. Components such as the carriages, track, power systems, software, communication systems, fire systems, door sets within stations, and other safety features were becoming obsolete, with manufacturer support no longer available, replacing the entire system was deemed cost-prohibitive. The TTS had also become a cause of bottlenecks, as it delivered large groups of passengers simultaneously to the border control area.
After closing the system, the TTS track will undergo partial demolition, with the track underneath the existing canopy being removed. The remaining track, supporting structure, and TTS maintenance facility will remain intact but not operational. The plan is to replace the TTS system with pedestrian Sky Link bridges, so both outbound and inbound passengers would walk to and from their gates. During the development passengers will be transported on buses which will increase the journey time to the boarding gates. On 31 October 2023 London Stansted Airport was granted planning permission to extend its terminal building and decommission the Stansted TTS.
Pictures
See also
Gatwick Airport Shuttle Transit
Heathrow Terminal 5 Transit
Luton DART
References
Kata Kunci Pencarian:
- Bandar Udara Internasional Hong Kong
- Bandar Udara Internasional Incheon
- Bandar Udara Internasional Liberty Newark
- Bandar Udara Gardermoen Oslo
- London
- Biman Bangladesh Airlines
- Stansted Airport Transit System
- London Stansted Airport
- Heathrow Terminal 5 Transit
- List of airport people mover systems
- Airports of London
- List of busiest airports in the United Kingdom
- List of driverless train systems
- Stansted Express
- Rubber-tyred metro
- Merseytram