- Source: Line 3 (Chongqing Rail Transit)
CRT 3/info/line" target="_blank">Line 3 (and the branch 3/info/line" target="_blank">line branded as Konggang 3/info/line" target="_blank">line) runs from north to south, linking the districts separated by Chongqing's two main rivers, the Yangtze (Chang Jiang) and Jialing rivers. Built by Japan's ODA project, it uses Hitachi, Ltd. monorail vehicles and technology. The first phase of the 3/info/line" target="_blank">line began construction on 5 April 2007. The initial segment from Lianglukou to Yuanyang (18 stations, 17.5 km (10.9 mi)) opened on September 29, 2011, with a northern extension from Yuanyang to Jiangbei Airport opening on December 30, 2011 and a southern extension from Ertang (Currently Chongqing Jiaotong University) to terminus Yudong on December 28, 2012. At 55.5 km (34.5 mi), plus 9.97 km (6.20 mi) for Konggang branch 3/info/line" target="_blank">line opened on December 28, 2016, 3/info/line" target="_blank">Line 3 is the longest single monorail in the world by track length. 3/info/line" target="_blank">Line 3 is also the world's busiest monorail 3/info/line" target="_blank">line with a daily ridership of over 675,000 passengers per day.
There are interchange stations in central Yuzhong district for transfer to Jiefangbei CBD with 3/info/line" target="_blank">Line 1 at Lianglukou and with 3/info/line" target="_blank">Line 2 at Niujiaotuo.
Opening timeline
Service routes
Yudong – Terminal 2 of Jiangbei Airport
Yudong → Longtousi (shown as "↓" below)
Terminal 2 of Jiangbei Airport – Xuetangwan/Longtousi (shown as "↑" below)
Bijin – Jurenba (6-car trains only)
Current stations
References
Kata Kunci Pencarian:
- Manila Metro Rail Transit System
- Sistem Angkutan Kereta Ringan Manila
- Dhaka Metro
- Transportasi rel dalam kota di Tiongkok
- Sistem Angkutan Massal Terpadu Lembah Klang
- MRT Jakarta
- Metro Delhi
- Metro Lahore
- Kereta Bawah Tanah Metropolitan Seoul
- Sistem metro menurut jumlah penumpang tahunan
- Line 3 (Chongqing Rail Transit)
- Chongqing Rail Transit
- Line 6 (Chongqing Rail Transit)
- Line 2 (Chongqing Rail Transit)
- Loop line (Chongqing Rail Transit)
- Line 10 (Chongqing Rail Transit)
- Line 1 (Chongqing Rail Transit)
- Line 9 (Chongqing Rail Transit)
- Line 4 (Chongqing Rail Transit)
- Line 27 (Chongqing Rail Transit)