- Source: Line S3 (Chengdu Metro)
Line S3 of the Chengdu Metro (simplified Chinese: 成都地铁S3线; traditional Chinese: 成都地鐵S3線), also known as Ziyang Line (Chinese: 资阳线), is a rapid transit line in Sichuan Province, China. The line is 38.7 km long and connects Futian in Chengdu to Ziyang Bei Station in Ziyang. It is opened in 29 September 2024.
Description
The line will use 160 km/h Type-A trains. The investment is 14.93 billion CNY. The line will have both underground and ground level sections. It also passes through Tuo River between 1st Tuo River Bridge and 3rd Tuo River Bridge.
Total investment for the line is 14.93 billion CNY. 40% is paid by Chengdu; relocation fee in Ziyang is paid by Ziyang Government; 54.1% left is mortgage from bank.
On 27 Nov 2020, construction officially started for Line S3.
On 10 March 2023, Line S3 finished all tunnel and bridge work, entering electric work stage.
On 31 May 2023, Line S3 (Ziyang Line) started mechanical and electrical work, after competing line construction.
Stations
Operation
The line uses Type-A Trains operating at 160 km/h speed and powered by 25kV AC overhead lines.
The whole line will use 4-car Trains in opening and foreseeable future, with 11 Trains (44 Cars) planning to be purchased.
References
Kata Kunci Pencarian:
- Transportasi rel dalam kota di Tiongkok
- Line S3 (Chengdu Metro)
- Chengdu Metro
- Line 18 (Chengdu Metro)
- List of Chengdu Metro stations
- Nanjing Metro
- Nanjing South railway station
- Cross-platform interchange
- Urban rail transit in China
- 2024 in rail transport
- Dashengguan Yangtze River Bridge